OIL,LUBRICANT,ISO VG 150,MINERAL,1L

Material 4100107281 · OIL · Plant 1000

AMonitorCritical insurance spare
Material
4100107281
Category
OIL
Base unit
L
MRP type
Stock Item
Criticality
A (3 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
24 d · P80 36 d
Unit price
Rp 157,448 (est.)

Recommendation

  • 1.Forecast 6.0 L/year: 3.1 unplanned (installed-base failure prior (no history)) + 2.9 from the maintenance plan.
  • 2.Lead time ~24 days; expected demand during lead time 0.2.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 11, order up to 22.
  • 4.No issue in 17 months, but it protects critical equipment: keep it.
  • 5.Installed on 6 FuncLoc(s), 3 of them criticality A/B.
Price estimatedLead time estimated
On hand / on order
12 / 0
no open PO
Today Min / Max
5 / 15
static parameters in BoM
Rec. Min (reorder point)
11
safety stock 11
Rec. Max
22
order qty 11
Service level
100.0%
stockout risk now 0%
Unit price
Rp 157,448
Category + unit estimate
ML early warning: 8% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 4 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 79.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 6 functional locations

3 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1156A
SEAL OIL PUMP
A131.05
PX_KC-624A
RECYCLE ETHANE BLOWER
B152.28
PX_PP-319B
ETHYLENE PUMP
B100.19
PX_PP-1470A
METHANE PUMP
C131.05
PX_KC-891A
HYDROGEN FAN
S151.85
PX_KC-145
ETHYLENE FAN
S100.57

Lead time and procurement

Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
02 Nov 2026PX_PP-319BLube oil change0.72
01 Feb 2027PX_PP-319BLube oil change0.72
04 May 2027PX_PP-319BLube oil change0.72
03 Aug 2027PX_PP-319BLube oil change0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
28 Sept 2026LowPX_PP-1470AReplace lamp as per PM finding
16 Sept 2026MediumPX_KC-891AKC-891A high vibration
21 Aug 2026MediumPX_KC-624AKC-624A high vibration
10 Aug 2026MediumPX_KC-624ALeak from packing
18 Jun 2026LowPX_KC-624AOverhaul
20 Apr 2026MediumPX_PP-1156AInstall scaffolding at PP-1156A
04 Mar 2026MediumPX_PP-1470AOil leak at PP-1470A bearing housing
20 Feb 2026MediumPX_KC-891A[MSI-B-26-RKP-241/M] Replace line
19 Feb 2026MediumPX_KC-624AOverhaul
09 Nov 2025LowPX_KC-891ARepair insulation KC-891A

Recent goods issues

Never issued in the 17-month history.