OIL,LUBRICANT,ISO VG 46,MINERAL,1L
Material 4100107308 · OIL · Plant 1000
AReduceSlow-moving
- Material
- 4100107308
- Category
- OIL
- Base unit
- L
- MRP type
- Stock Item
- Criticality
- A (4 of 5 FuncLocs A/B)
- Supplier
- DUTA ENERGI ABADI PT
- Lead time
- 18 d · P80 16 d
- Unit price
- Rp 68,529
Recommendation
- 1.Forecast 12 L/year: 12 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~18 days; expected demand during lead time 0.6.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 22.
- 4.Stock 338 exceeds the level to keep (25) by 313; the level includes the 25 used in the last turnaround.
- 5.Installed on 5 FuncLoc(s), 4 of them criticality A/B.
- 6.ML early warning: 41% probability of demand in the next 90 days.
ML early warningLast turnaround used 25Single sourceSame description as 1 other material number
On hand / on order
338 / 0
no open PO
Today Min / Max
6 / 14
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 10
Rec. Max
22
order qty 12
Service level
100.0%
stockout risk now 0%
Unit price
Rp 68,529
PO history
ML early warning: 41% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 259 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (25 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 666.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 5 functional locations
4 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-167 GASOLINE PUMP | A | 1 | 5 | 2.33 |
| PX_PP-1890 BFW PUMP | A | 1 | 5 | 1.47 |
| PX_KC-391D QUENCH WATER COMPRESSOR | A | 1 | 2 | 1.43 |
| PX_KC-801 DEMIN WATER FAN | A | 1 | 2 | 1.43 |
| PX_KC-505D METHANE COMPRESSOR | S | 1 | 1 | 1.00 |
Lead time and procurement
Lead time 18 ± 7 days (PO history, 4 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 07 Sept 2026 | PR03 Regular replenishment | 11 | Rp 69,743 | 23 Sept 2026 | 16 d |
| 12 Jun 2026 | PR03 Regular replenishment | 13 | Rp 68,678 | 28 Jun 2026 | 16 d |
| 04 Sept 2025 | PR03 Regular replenishment | 6 | Rp 68,353 | 15 Sept 2025 | 11 d |
| 01 Sept 2025 | PR03 Regular replenishment | 6 | Rp 68,379 | 15 Sept 2025 | 14 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 07 Sept 2026 | Medium | PX_PP-1890 | PP-1890 discharge pressure low |
| 03 Aug 2026 | Low | PX_PP-1890 | Painting PP-1890 |
| 27 Jul 2026 | Medium | PX_PP-167 | Replace bearing PP-167 |
| 12 Apr 2026 | Emergency | PX_KC-801 | KC-801 high vibration |
| 23 Mar 2026 | Emergency | PX_PP-1890 | Leak from packing |
| 04 Mar 2026 | Medium | PX_PP-167 | Leak from packing |
| 28 Dec 2025 | Medium | PX_PP-167 | Replace lamp as per PM finding |
| 27 Dec 2025 | Low | PX_KC-391D | Leak from packing |
| 04 Nov 2025 | Low | PX_PP-167 | PP-167 abnormal noise |
| 25 Oct 2025 | Medium | PX_PP-1890 | PP-1890 discharge pressure low |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 15 Jan 2026 | 5 | 201000015943 | Corrective |
| 25 Dec 2025 | 5 | 203000006078 | Turnaround |
| 24 Dec 2025 | 20 | 203000006078 | Turnaround |