OIL,LUBRICANT,ISO VG 150,MINERAL,209L
Material 4100107345 · OIL · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4100107345
- Category
- OIL
- Base unit
- L
- MRP type
- Stock Item
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- GEMILANG SUPLINDO SENTOSA PT
- Lead time
- 25 d · P80 36 d
- Unit price
- Rp 161,311
Recommendation
- 1.Forecast 226 L/year: 226 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~25 days; expected demand during lead time 15.
- 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 200, order up to 400.
- 4.On hand 18 + on order 0 is at or below the reorder point: order 382 now.
- 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
- 6.Identical part 4100107983 holds spare stock: transfer 9 L instead of buying, then buy the remaining 373.
Proposed purchase requisition
373 L
Rp 60.2M · order by 01 Oct 2026
Expected arrival ≈ 25 days
Single sourceSame description as 1 other material number
On hand / on order
18 / 0
no open PO
Today Min / Max
16 / 44
static parameters in BoM
Rec. Min (reorder point)
200
safety stock 185
Rec. Max
400
order qty 200
Service level
99.7%
stockout risk now 7%
Unit price
Rp 161,311
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 64 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 315.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 2 functional locations
2 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1701B QUENCH OIL PUMP | A | 1 | 3 | 1.05 |
| PX_KC-464A CONDENSATE BLOWER | A | 1 | 2 | 1.43 |
Lead time and procurement
Lead time 25 ± 13 days (PO history + category, 1 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 16 Dec 2025 | PR03 Regular replenishment | 44 | Rp 161,311 | 11 Jan 2026 | 26 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 15 Jul 2026 | Medium | PX_PP-1701B | Install cover plate for MCP cracking |
| 18 Nov 2025 | Medium | PX_PP-1701B | Replace lamp as per PM finding |
| 02 Oct 2025 | Medium | PX_KC-464A | KC-464A lube oil filter DP high |
| 25 Jul 2025 | Medium | PX_KC-464A | KC-464A lube oil filter DP high |
| 18 May 2025 | Low | PX_PP-1701B | Install scaffolding at PP-1701B |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 29 Jul 2026 | 200 | 201000001418 | Corrective |