Sparely
DU

OIL,LUBRICANT,ISO VG 150,MINERAL,209L

Material 4100107345 · OIL · Plant 1000

AReorderNormalBelow reorder point
Material
4100107345
Category
OIL
Base unit
L
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
GEMILANG SUPLINDO SENTOSA PT
Lead time
25 d · P80 36 d
Unit price
Rp 161,311

Recommendation

  • 1.Forecast 226 L/year: 226 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~25 days; expected demand during lead time 15.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 200, order up to 400.
  • 4.On hand 18 + on order 0 is at or below the reorder point: order 382 now.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
  • 6.Identical part 4100107983 holds spare stock: transfer 9 L instead of buying, then buy the remaining 373.
Proposed purchase requisition
373 L
Rp 60.2M · order by 01 Oct 2026
Expected arrival ≈ 25 days
Single sourceSame description as 1 other material number
On hand / on order
18 / 0
no open PO
Today Min / Max
16 / 44
static parameters in BoM
Rec. Min (reorder point)
200
safety stock 185
Rec. Max
400
order qty 200
Service level
99.7%
stockout risk now 7%
Unit price
Rp 161,311
PO history
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 64 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 315.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1701B
QUENCH OIL PUMP
A131.05
PX_KC-464A
CONDENSATE BLOWER
A121.43

Lead time and procurement

Lead time 25 ± 13 days (PO history + category, 1 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
16 Dec 2025PR03
Regular replenishment
44Rp 161,31111 Jan 202626 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
15 Jul 2026MediumPX_PP-1701BInstall cover plate for MCP cracking
18 Nov 2025MediumPX_PP-1701BReplace lamp as per PM finding
02 Oct 2025MediumPX_KC-464AKC-464A lube oil filter DP high
25 Jul 2025MediumPX_KC-464AKC-464A lube oil filter DP high
18 May 2025LowPX_PP-1701BInstall scaffolding at PP-1701B

Recent goods issues

Posting dateQtyOrderOrder type
29 Jul 2026200201000001418Corrective