OIL,LUBRICANT,ISO VG 220,SYNTHETIC,1L
Material 4100107418 · OIL · Plant 1000
AMonitorCritical insurance spare
- Material
- 4100107418
- Category
- OIL
- Base unit
- L
- MRP type
- Stock Item
- Criticality
- A (3 of 3 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 24 d · P80 36 d
- Unit price
- Rp 157,448 (est.)
Recommendation
- 1.Forecast 3.6 L/year: 3.6 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~24 days; expected demand during lead time 0.2.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 11, order up to 22.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
- 5.No issue in 17 months, but it protects critical equipment: keep it.
- 6.Installed on 3 FuncLoc(s), 3 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimatedSame description as 1 other material number
On hand / on order
8 / 0
no open PO
Today Min / Max
4 / 11
static parameters in BoM
Rec. Min (reorder point)
11
safety stock 11
Rec. Max
22
order qty 11
Service level
100.0%
stockout risk now 2%
Unit price
Rp 157,448
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 92.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 3 functional locations
3 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-536A LUBE OIL BLOWER | A | 1 | 11 | 4.42 |
| PX_KC-588 CAUSTIC FAN | A | 1 | 2 | 1.00 |
| PX_KC-225D INHIBITOR COMPRESSOR | B | 1 | 9 | 2.71 |
Lead time and procurement
Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 22 Sept 2026 | High | PX_KC-536A | Overhaul |
| 11 Sept 2026 | Low | PX_KC-225D | KC-225D lube oil filter DP high |
| 22 Aug 2026 | Low | PX_KC-225D | Install scaffolding at KC-225D |
| 08 Aug 2026 | High | PX_KC-536A | KC-536A bearing temp high |
| 27 Jul 2026 | Low | PX_KC-225D | Painting KC-225D |
| 24 Jul 2026 | High | PX_KC-536A | Install scaffolding at KC-536A |
| 05 Jul 2026 | Medium | PX_KC-536A | Leak from packing |
| 24 Jun 2026 | Medium | PX_KC-536A | KC-536A bearing temp high |
| 20 Jun 2026 | Medium | PX_KC-225D | Inspect coupling KC-225D |
| 07 Jun 2026 | High | PX_KC-225D | KC-225D high vibration |
Recent goods issues
Never issued in the 17-month history.