Sparely
DU

OIL,LUBRICANT,ISO VG 68,SYNTHETIC,5L

Material 4100107434 · OIL · Plant 1000

ATransferNormalSlow-moving
Material
4100107434
Category
OIL
Base unit
L
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
MEGA MANDIRI PERSADA PT
Lead time
27 d · P80 36 d
Unit price
Rp 211,731

Recommendation

  • 1.Forecast 4.0 L/year: 4.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~27 days; expected demand during lead time 0.3.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 13.
  • 4.On hand 2 + on order 0 is at or below the reorder point: 11 needed.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
  • 6.Identical part 4100108277 holds spare stock: transfer 11 L instead of buying — no purchase needed.
Single sourceSame description as 2 other material numbers
On hand / on order
2 / 0
no open PO
Today Min / Max
2 / 3
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 8
Rec. Max
13
order qty 5
Service level
100.0%
stockout risk now 7%
Unit price
Rp 211,731
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 293 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 280.2M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-479C
DILUTION STEAM COMPRESSOR
A152.71
PX_PP-695B
CAUSTIC PUMP
A100.19

Lead time and procurement

Lead time 27 ± 13 days (PO history + category, 2 PO lines) · on-time 75%

PR dateTypeQtyUnit priceDeliveryLead time
09 Dec 2025PR03
Regular replenishment
4Rp 212,04714 Jan 202636 d
03 Oct 2025PR03
Regular replenishment
3Rp 211,41428 Oct 202525 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
10 Sept 2026MediumPX_KC-479CKC-479C bearing temp high
18 Aug 2026LowPX_KC-479CLeak from packing
31 May 2026MediumPX_KC-479C[MSI-B-26-KNK-222/M] Replace line
23 Sept 2025LowPX_KC-479COverhaul
02 Jul 2025LowPX_KC-479CKC-479C bearing temp high

Recent goods issues

Posting dateQtyOrderOrder type
12 Dec 20254201000000773Corrective