OIL,LUBRICANT,ISO VG 68,SYNTHETIC,209L

Material 4100107549 · OIL · Plant 1000

AReorderCriticalStockout
Material
4100107549
Category
OIL
Base unit
L
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
24 d · P80 36 d
Unit price
Rp 157,448 (est.)

Recommendation

  • 1.Forecast 4.7 L/year: 1.9 unplanned (installed-base failure prior (no history)) + 2.9 from the maintenance plan.
  • 2.Lead time ~24 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 11, order up to 22.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 22 now.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
  • 6.Identical part 4100108308 holds spare stock: transfer 9 L instead of buying, then buy the remaining 13.
Proposed purchase requisition
13 L
Rp 2.0M · order by 01 Oct 2026
Expected arrival ≈ 24 days
Price estimatedLead time estimatedSame description as 1 other material number
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
11
safety stock 11
Rec. Max
22
order qty 11
Service level
100.0%
stockout risk now 1%
Unit price
Rp 157,448
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 47.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-316D
METHANOL FAN
A151.43
PX_PP-745
FEED PUMP
B172.76

Lead time and procurement

Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Nov 2026PX_PP-745Lube oil change0.72
31 Jan 2027PX_PP-745Lube oil change0.72
03 May 2027PX_PP-745Lube oil change0.72
02 Aug 2027PX_PP-745Lube oil change0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
10 Aug 2026MediumPX_KC-316DOverhaul
08 Aug 2026MediumPX_PP-745PP-745 high vibration
03 Aug 2026MediumPX_KC-316DPainting KC-316D
08 Jun 2026EmergencyPX_PP-745[MSI-B-26-YAH-100/M] Replace line
14 May 2026MediumPX_KC-316DKC-316D high vibration
13 May 2026LowPX_PP-745Leak from packing
24 Apr 2026LowPX_KC-316DInstall scaffolding at KC-316D
06 Feb 2026LowPX_PP-745Repair insulation PP-745
20 Nov 2025MediumPX_PP-745Install cover plate for MCP cracking
19 Oct 2025LowPX_PP-745Oil leak at PP-745 bearing housing

Recent goods issues

Never issued in the 17-month history.