OIL,LUBRICANT,ISO VG 46,SYNTHETIC,1L
Material 4100107659 · OIL · Plant 1000
AReorderNormalCritical insurance spare
- Material
- 4100107659
- Category
- OIL
- Base unit
- L
- MRP type
- Stock Item
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 24 d · P80 36 d
- Unit price
- Rp 157,448 (est.)
Recommendation
- 1.Forecast 3.6 L/year: 0.7 unplanned (installed-base failure prior (no history)) + 2.9 from the maintenance plan.
- 2.Lead time ~24 days; expected demand during lead time 0.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 11, order up to 22.
- 4.On hand 5 + on order 0 is at or below the reorder point: order 17 now.
- 5.No issue in 17 months, but it protects critical equipment: keep it.
- 6.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
17 L
Rp 2.7M · order by 01 Oct 2026
Expected arrival ≈ 24 days
Price estimatedLead time estimatedSame description as 1 other material number
On hand / on order
5 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
11
safety stock 11
Rec. Max
22
order qty 11
Service level
100.0%
stockout risk now 0%
Unit price
Rp 157,448
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 18.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 2 functional locations
2 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-396 WASH WATER BLOWER | A | 1 | 3 | 1.43 |
| PX_PP-1266 LUBE OIL PUMP | A | 1 | 1 | 0.19 |
Lead time and procurement
Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 03 Dec 2026 | PX_PP-1266 | Lube oil change | 0.72 |
| 04 Mar 2027 | PX_PP-1266 | Lube oil change | 0.72 |
| 04 Jun 2027 | PX_PP-1266 | Lube oil change | 0.72 |
| 03 Sept 2027 | PX_PP-1266 | Lube oil change | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 26 Sept 2026 | Medium | PX_KC-396 | Replace lamp as per PM finding |
| 17 May 2026 | Low | PX_KC-396 | Overhaul |
| 15 May 2025 | Medium | PX_KC-396 | KC-396 bearing temp high |
| 07 May 2025 | Low | PX_PP-1266 | PSM25/Overhaul PP-1266 |
Recent goods issues
Never issued in the 17-month history.