OIL,LUBRICANT,ISO VG 150,SYNTHETIC,5L

Material 4100107701 · OIL · Plant 1000

SReduceExcess
Material
4100107701
Category
OIL
Base unit
L
MRP type
Stock Item
Criticality
S (0 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
24 d · P80 36 d
Unit price
Rp 157,448 (est.)

Recommendation

  • 1.Forecast 16 L/year: 16 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~24 days; expected demand during lead time 1.0.
  • 3.A 90.5% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 16.
  • 4.Stock 19 exceeds the level to keep (16) by 3.
Price estimatedLead time estimatedSame description as 1 other material number
On hand / on order
19 / 0
no open PO
Today Min / Max
5 / 9
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
16
order qty 16
Service level
90.5%
stockout risk now 0%
Unit price
Rp 157,448
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 168 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Lumpy · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~13 days.

Installed on 2 functional locations

0 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-365C
INHIBITOR BLOWER
S173.14
PX_PP-1171
BOTTOM PUMP
S121.05

Lead time and procurement

Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
26 Sept 2026MediumPX_KC-365CKC-365C lube oil filter DP high
26 Jul 2026MediumPX_KC-365CInspect coupling KC-365C
18 Nov 2025MediumPX_KC-365CInstall scaffolding at KC-365C
01 Nov 2025MediumPX_KC-365CKC-365C bearing temp high
26 Oct 2025LowPX_KC-365CLeak from packing
16 Sept 2025MediumPX_KC-365CKC-365C lube oil filter DP high
13 Sept 2025EmergencyPX_PP-1171PP-1171 high vibration
25 Aug 2025MediumPX_PP-1171PP-1171 abnormal noise
19 Jul 2025MediumPX_KC-365CRepair insulation KC-365C

Recent goods issues

Posting dateQtyOrderOrder type
16 Apr 20261201000007152Corrective
14 Sept 202520202000000023Emergency