OIL,LUBRICANT,ISO VG 100,SYNTHETIC,1L

Material 4100107747 · OIL · Plant 1000

AMonitorCritical insurance spare
Material
4100107747
Category
OIL
Base unit
L
MRP type
Stock Item
Criticality
A (1 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
24 d · P80 36 d
Unit price
Rp 157,448 (est.)

Recommendation

  • 1.Forecast 3.0 L/year: 3.0 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~24 days; expected demand during lead time 0.2.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 11, order up to 22.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Installed on 4 FuncLoc(s), 1 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
11 / 0
no open PO
Today Min / Max
4 / 7
static parameters in BoM
Rec. Min (reorder point)
11
safety stock 11
Rec. Max
22
order qty 11
Service level
100.0%
stockout risk now 0%
Unit price
Rp 157,448
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 75.3M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 4 functional locations

1 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-645C
LUBE OIL PUMP
A110.19
PX_KC-538
REFLUX BLOWER
S1124.85
PX_KC-216B
LEAN AMINE FAN
S110.57
PX_KC-383A
CAUSTIC BLOWER
S111.00

Lead time and procurement

Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Sept 2026EmergencyPX_KC-538KC-538 high vibration
16 Sept 2026EmergencyPX_KC-538Leak from packing
01 Sept 2026MediumPX_KC-538KC-538 lube oil filter DP high
01 Sept 2026MediumPX_KC-538KC-538 high vibration
11 Jun 2026MediumPX_KC-538Leak from packing
07 May 2026MediumPX_KC-538KC-538 bearing temp high
12 Apr 2026MediumPX_KC-538KC-538 high vibration
04 Apr 2026MediumPX_KC-538Leak from packing
30 Mar 2026MediumPX_KC-538KC-538 high vibration
01 Oct 2025MediumPX_KC-538Leak from packing

Recent goods issues

Never issued in the 17-month history.