OIL,LUBRICANT,ISO VG 220,MINERAL,209L

Material 4100107834 · OIL · Plant 1000

BReorderNormalCritical insurance spare
Material
4100107834
Category
OIL
Base unit
L
MRP type
Stock Item
Criticality
B (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
24 d · P80 36 d
Unit price
Rp 157,448 (est.)

Recommendation

  • 1.Forecast 6.5 L/year: 1.5 unplanned (installed-base failure prior (no history)) + 5.0 from the maintenance plan.
  • 2.Lead time ~24 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 11, order up to 22.
  • 4.On hand 4 + on order 0 is at or below the reorder point: order 18 now.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
18 L
Rp 2.8M · order by 01 Oct 2026
Expected arrival ≈ 24 days
Price estimatedLead time estimatedSame description as 1 other material number
On hand / on order
4 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
11
safety stock 11
Rec. Max
22
order qty 11
Service level
100.0%
stockout risk now 1%
Unit price
Rp 157,448
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 2 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 9.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~13 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-745
FEED PUMP
B172.76
PX_PP-720
ETHYLENE PUMP
C110.62

Lead time and procurement

Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Nov 2026PX_PP-720Lube oil change0.72
01 Nov 2026PX_PP-745Lube oil change0.72
31 Jan 2027PX_PP-745Lube oil change0.72
03 Mar 2027PX_PP-720Lube oil change0.72
03 May 2027PX_PP-745Lube oil change0.72
03 Jul 2027PX_PP-720Lube oil change0.72
02 Aug 2027PX_PP-745Lube oil change0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
08 Aug 2026MediumPX_PP-745PP-745 high vibration
08 Jun 2026EmergencyPX_PP-745[MSI-B-26-YAH-100/M] Replace line
13 May 2026LowPX_PP-745Leak from packing
06 Feb 2026LowPX_PP-745Repair insulation PP-745
20 Nov 2025MediumPX_PP-745Install cover plate for MCP cracking
19 Oct 2025LowPX_PP-745Oil leak at PP-745 bearing housing
07 Jun 2025LowPX_PP-720Oil leak at PP-720 bearing housing
26 May 2025LowPX_PP-745Overhaul PP-745

Recent goods issues

Never issued in the 17-month history.