OIL,LUBRICANT,ISO VG 46,SYNTHETIC,1L

Material 4100107920 · OIL · Plant 1000

AMonitorInsurance gap
Material
4100107920
Category
OIL
Base unit
L
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
24 d · P80 36 d
Unit price
Rp 157,448 (est.)

Recommendation

  • 1.Forecast 3.8 L/year: 3.8 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~24 days; expected demand during lead time 0.3.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 11, order up to 22.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimatedSame description as 1 other material number
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
11
safety stock 11
Rec. Max
22
order qty 11
Service level
100.0%
stockout risk now 2%
Unit price
Rp 157,448
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 97.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1729A
COOLING WATER PUMP
A1217.90
PX_PP-682A
RECYCLE ETHANE PUMP
B110.62

Lead time and procurement

Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
27 Sept 2026MediumPX_PP-1729AInstall scaffolding at PP-1729A
20 Sept 2026LowPX_PP-1729A[MSI-B-26-TCT-349] Permanent repair
28 Aug 2026EmergencyPX_PP-1729AInstall scaffolding at PP-1729A
11 Aug 2026MediumPX_PP-1729APP-1729A seal leak
19 Jun 2026MediumPX_PP-1729AReplace bearing PP-1729A
17 Jun 2026MediumPX_PP-1729A[MSI-B-26-JZF-388/M] Replace line
20 Mar 2026MediumPX_PP-1729ARepair insulation PP-1729A
06 Mar 2026HighPX_PP-1729AInstall cover plate for MCP cracking
08 Feb 2026MediumPX_PP-1729ALeak from packing
26 Jan 2026LowPX_PP-1729AOverhaul PP-1729A

Recent goods issues

Never issued in the 17-month history.