OIL,LUBRICANT,ISO VG 68,MINERAL,5L

Material 4100108034 · OIL · Plant 1000

ATransferNormalCritical insurance spare
Material
4100108034
Category
OIL
Base unit
L
MRP type
Stock Item
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
24 d · P80 36 d
Unit price
Rp 157,448 (est.)

Recommendation

  • 1.Forecast 4.9 L/year: 2.1 unplanned (installed-base failure prior (no history)) + 2.9 from the maintenance plan.
  • 2.Lead time ~24 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 11, order up to 22.
  • 4.On hand 2 + on order 0 is at or below the reorder point: 20 needed.
  • 5.No issue in 17 months, but it protects critical equipment: keep it.
  • 6.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
  • 7.Identical part 4100107224 holds spare stock: transfer 20 L instead of buying — no purchase needed.
Price estimatedLead time estimatedSame description as 1 other material number
On hand / on order
2 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
11
safety stock 11
Rec. Max
22
order qty 11
Service level
100.0%
stockout risk now 1%
Unit price
Rp 157,448
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 6 failure notifications on its equipment in 90 days, 1 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 52.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 2 functional locations

1 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-226
HYDROGEN AIR COMPRESSOR
A162.28
PX_PP-1106A
LUBE OIL PUMP
C162.33

Lead time and procurement

Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Nov 2026PX_PP-1106ALube oil change0.72
31 Jan 2027PX_PP-1106ALube oil change0.72
03 May 2027PX_PP-1106ALube oil change0.72
02 Aug 2027PX_PP-1106ALube oil change0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
24 Sept 2026LowPX_PP-1106AReplace bearing PP-1106A
03 Sept 2026LowPX_KC-226KC-226 bearing temp high
25 Aug 2026MediumPX_PP-1106APP-1106A high vibration
21 Aug 2026LowPX_KC-226KC-226 high vibration
06 Aug 2026MediumPX_PP-1106AOverhaul PP-1106A
01 Aug 2026LowPX_PP-1106APP-1106A discharge pressure low
19 Jun 2026MediumPX_PP-1106APP-1106A seal leak
16 Jan 2026LowPX_KC-226KC-226 bearing temp high
10 Nov 2025LowPX_KC-226Overhaul
21 Oct 2025MediumPX_KC-226Install scaffolding at KC-226

Recent goods issues

Never issued in the 17-month history.