OIL,LUBRICANT,ISO VG 220,MINERAL,209L

Material 4100108057 · OIL · Plant 1000

BReorderNormalSlow-moving
Material
4100108057
Category
OIL
Base unit
L
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
MEGA ELEKTRIK ABADI PT
Lead time
25 d · P80 36 d
Unit price
Rp 81,044

Recommendation

  • 1.Forecast 299 L/year: 299 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~25 days; expected demand during lead time 20.
  • 3.A 99.5% service level gives the lowest holding + downtime-risk cost: reorder at 200, order up to 436.
  • 4.On hand 45 + on order 0 is at or below the reorder point: order 391 now.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
391 L
Rp 31.7M · order by 01 Oct 2026
Expected arrival ≈ 25 days
Single sourceSame description as 1 other material number
On hand / on order
45 / 0
no open PO
Today Min / Max
13 / 23
static parameters in BoM
Rec. Min (reorder point)
200
safety stock 180
Rec. Max
436
order qty 236
Service level
99.5%
stockout risk now 10%
Unit price
Rp 81,044
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 243 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 105.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~13 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1320D
INHIBITOR PUMP
B1114.47

Lead time and procurement

Lead time 25 ± 13 days (PO history + category, 1 PO lines) · on-time 58%

PR dateTypeQtyUnit priceDeliveryLead time
27 May 2025PR03
Regular replenishment
89Rp 81,04423 Jun 202527 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
07 Jul 2026MediumPX_PP-1320DPP-1320D seal leak
26 Apr 2026LowPX_PP-1320DPP-1320D abnormal noise
07 Apr 2026MediumPX_PP-1320DPP-1320D seal leak
02 Mar 2026MediumPX_PP-1320DPP-1320D seal leak
01 Mar 2026LowPX_PP-1320DReplace lamp as per PM finding
26 Feb 2026MediumPX_PP-1320DPP-1320D discharge pressure low
23 Jan 2026MediumPX_PP-1320DReplace lamp as per PM finding
19 Jan 2026MediumPX_PP-1320DOil leak at PP-1320D bearing housing
02 Nov 2025LowPX_PP-1320DReplace bearing PP-1320D
01 Nov 2025MediumPX_PP-1320DReplace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
31 Jan 2026200201000013677Corrective