OIL,LUBRICANT,ISO VG 100,MINERAL,1L

Material 4100108114 · OIL · Plant 1000

AReduceSlow-moving
Material
4100108114
Category
OIL
Base unit
L
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
24 d · P80 36 d
Unit price
Rp 157,448 (est.)

Recommendation

  • 1.Forecast 8.9 L/year: 8.9 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~24 days; expected demand during lead time 0.6.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 19.
  • 4.Stock 174 exceeds the level to keep (19) by 155.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimatedSame description as 1 other material number
On hand / on order
174 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 10
Rec. Max
19
order qty 9
Service level
100.0%
stockout risk now 0%
Unit price
Rp 157,448
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 438 days ago, 5 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 498.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-717
FLUSHING OIL COMPRESSOR
A194.00
PX_PP-1498C
CHARGE GAS PUMP
B151.90

Lead time and procurement

Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
21 Sept 2026LowPX_KC-717Leak from packing
25 Aug 2026LowPX_PP-1498C[MSI-B-26-LAH-309/M] Replace line
08 Aug 2026MediumPX_KC-717Repair insulation KC-717
22 Jul 2026HighPX_PP-1498CInstall scaffolding at PP-1498C
20 Jul 2026LowPX_KC-717Inspect coupling KC-717
05 Jul 2026MediumPX_KC-717Overhaul
16 Jun 2026MediumPX_PP-1498COverhaul PP-1498C
28 Apr 2026MediumPX_PP-1498COil leak at PP-1498C bearing housing
12 Mar 2026LowPX_KC-717Replace lamp as per PM finding
01 Mar 2026MediumPX_KC-717Leak from packing

Recent goods issues

Posting dateQtyOrderOrder type
20 Jul 20255201000030417Corrective