OIL,LUBRICANT,ISO VG 100,MINERAL,1L
Material 4100108114 · OIL · Plant 1000
AReduceSlow-moving
- Material
- 4100108114
- Category
- OIL
- Base unit
- L
- MRP type
- Stock Item
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 24 d · P80 36 d
- Unit price
- Rp 157,448 (est.)
Recommendation
- 1.Forecast 8.9 L/year: 8.9 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~24 days; expected demand during lead time 0.6.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 10, order up to 19.
- 4.Stock 174 exceeds the level to keep (19) by 155.
- 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimatedSame description as 1 other material number
On hand / on order
174 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
10
safety stock 10
Rec. Max
19
order qty 9
Service level
100.0%
stockout risk now 0%
Unit price
Rp 157,448
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 438 days ago, 5 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 498.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 2 functional locations
2 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-717 FLUSHING OIL COMPRESSOR | A | 1 | 9 | 4.00 |
| PX_PP-1498C CHARGE GAS PUMP | B | 1 | 5 | 1.90 |
Lead time and procurement
Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 21 Sept 2026 | Low | PX_KC-717 | Leak from packing |
| 25 Aug 2026 | Low | PX_PP-1498C | [MSI-B-26-LAH-309/M] Replace line |
| 08 Aug 2026 | Medium | PX_KC-717 | Repair insulation KC-717 |
| 22 Jul 2026 | High | PX_PP-1498C | Install scaffolding at PP-1498C |
| 20 Jul 2026 | Low | PX_KC-717 | Inspect coupling KC-717 |
| 05 Jul 2026 | Medium | PX_KC-717 | Overhaul |
| 16 Jun 2026 | Medium | PX_PP-1498C | Overhaul PP-1498C |
| 28 Apr 2026 | Medium | PX_PP-1498C | Oil leak at PP-1498C bearing housing |
| 12 Mar 2026 | Low | PX_KC-717 | Replace lamp as per PM finding |
| 01 Mar 2026 | Medium | PX_KC-717 | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 20 Jul 2025 | 5 | 201000030417 | Corrective |