Sparely
DU

OIL,LUBRICANT,ISO VG 46,SYNTHETIC,20L

Material 4100108125 · OIL · Plant 1000

AMonitorInsurance gap
Material
4100108125
Category
OIL
Base unit
L
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
24 d · P80 36 d
Unit price
Rp 157,448 (est.)

Recommendation

  • 1.Forecast 0.6 L/year: 0.6 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~24 days; expected demand during lead time 0.0.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 11.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
2 / 3
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
11
order qty 11
Service level
99.7%
stockout risk now 0%
Unit price
Rp 157,448
Category + unit estimate
ML early warning: 2% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 14.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PY_PP-1056
QUENCH WATER PUMP
A131.05
PX_PP-641A
GASOLINE PUMP
A100.19

Lead time and procurement

Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
17 Dec 2025HighPY_PP-1056[MSI-B-25-SWZ-286] Permanent repair
22 Sept 2025MediumPY_PP-1056PP-1056 abnormal noise
13 May 2025LowPY_PP-1056Oil leak at PP-1056 bearing housing

Recent goods issues

Never issued in the 17-month history.