Sparely
DU

OIL,LUBRICANT,ISO VG 100,MINERAL,20L

Material 4100108143 · OIL · Plant 1000

SReducePotentially obsolete
Material
4100108143
Category
OIL
Base unit
L
MRP type
Stock Item
Criticality
S (0 of 1 FuncLocs A/B)
Supplier
CAHAYA TEKNIK PERSADA PT
Lead time
29 d · P80 36 d
Unit price
Rp 157,448

Recommendation

  • 1.Forecast 0.4 L/year: 0.4 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~29 days; expected demand during lead time 0.0.
  • 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
  • 4.Stock 14 exceeds the level to keep (0) by 14.
Convert to Non StockSingle sourceSame description as 3 other material numbers
On hand / on order
14 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 157,448
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 75,353/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~13 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-984C
CONDENSATE COMPRESSOR
S121.00

Lead time and procurement

Lead time 29 ± 13 days (PO history + category, 2 PO lines) · on-time 36%

PR dateTypeQtyUnit priceDeliveryLead time
06 Mar 2026PR06
Regular replenishment
2Rp 154,71902 Apr 202627 d
01 Oct 2025PR06
Regular replenishment
1Rp 160,17614 Nov 202544 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
05 Sept 2025MediumPX_KC-984COverhaul
30 May 2025LowPX_KC-984CInspect coupling KC-984C

Recent goods issues

Never issued in the 17-month history.