OIL,LUBRICANT,ISO VG 100,MINERAL,20L
Material 4100108143 · OIL · Plant 1000
SReducePotentially obsolete
- Material
- 4100108143
- Category
- OIL
- Base unit
- L
- MRP type
- Stock Item
- Criticality
- S (0 of 1 FuncLocs A/B)
- Supplier
- CAHAYA TEKNIK PERSADA PT
- Lead time
- 29 d · P80 36 d
- Unit price
- Rp 157,448
Recommendation
- 1.Forecast 0.4 L/year: 0.4 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~29 days; expected demand during lead time 0.0.
- 3.Expected downtime risk is lower than the cost of holding this part, so buying on demand is cheaper.
- 4.Stock 14 exceeds the level to keep (0) by 14.
Convert to Non StockSingle sourceSame description as 3 other material numbers
On hand / on order
14 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
–
safety stock 0
Rec. Max
don't stock
order qty 0
Service level
–
stockout risk now 0%
Unit price
Rp 157,448
PO history
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 75,353/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.05% for ~13 days.
Installed on 1 functional locations
0 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-984C CONDENSATE COMPRESSOR | S | 1 | 2 | 1.00 |
Lead time and procurement
Lead time 29 ± 13 days (PO history + category, 2 PO lines) · on-time 36%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 06 Mar 2026 | PR06 Regular replenishment | 2 | Rp 154,719 | 02 Apr 2026 | 27 d |
| 01 Oct 2025 | PR06 Regular replenishment | 1 | Rp 160,176 | 14 Nov 2025 | 44 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 05 Sept 2025 | Medium | PX_KC-984C | Overhaul |
| 30 May 2025 | Low | PX_KC-984C | Inspect coupling KC-984C |
Recent goods issues
Never issued in the 17-month history.