OIL,LUBRICANT,ISO VG 100,MINERAL,20L
Material 4100108222 · OIL · Plant 1000
BMonitorCritical insurance spare
- Material
- 4100108222
- Category
- OIL
- Base unit
- L
- MRP type
- Stock Item
- Criticality
- B (1 of 1 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 24 d · P80 36 d
- Unit price
- Rp 157,448 (est.)
Recommendation
- 1.Forecast 0.6 L/year: 0.6 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~24 days; expected demand during lead time 0.0.
- 3.A 99.6% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 11.
- 4.No issue in 17 months, but it protects critical equipment: keep it.
- 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimatedSame description as 3 other material numbers
On hand / on order
4 / 0
no open PO
Today Min / Max
2 / 6
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
11
order qty 11
Service level
99.6%
stockout risk now 0%
Unit price
Rp 157,448
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~13 days.
Installed on 1 functional locations
1 with criticality A/B · 1 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-886D BOTTOM FAN | B | 1 | 4 | 1.43 |
Lead time and procurement
Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Sept 2026 | Low | PX_KC-886D | KC-886D high vibration |
| 10 Jul 2026 | Medium | PX_KC-886D | Install scaffolding at KC-886D |
| 20 Apr 2026 | Low | PX_KC-886D | Replace lamp as per PM finding |
| 04 May 2025 | Medium | PX_KC-886D | [MSI-B-25-PZW-222/M] Replace line |
Recent goods issues
Never issued in the 17-month history.