OIL,LUBRICANT,ISO VG 46,MINERAL,5L

Material 4100108446 · OIL · Plant 1000

ATransferCriticalStockout
Material
4100108446
Category
OIL
Base unit
L
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
GEMILANG SUPLINDO SENTOSA PT
Lead time
22 d · P80 36 d
Unit price
Rp 210,630

Recommendation

  • 1.Forecast 1.0 L/year: 1.0 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~22 days; expected demand during lead time 0.1.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 2, order up to 3.
  • 4.On hand 0 + on order 0 is at or below the reorder point: 3 needed.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
  • 6.Identical part 4100107444 holds spare stock: transfer 3 L instead of buying — no purchase needed.
Single sourceSame description as 2 other material numbers
On hand / on order
0 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
2
safety stock 2
Rec. Max
3
order qty 1
Service level
100.0%
stockout risk now 6%
Unit price
Rp 210,630
PO history
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 10 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 274.4M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-801
DEMIN WATER FAN
A121.43
PX_PP-1967A
WASH WATER PUMP
A110.19

Lead time and procurement

Lead time 22 ± 13 days (PO history + category, 2 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
18 Nov 2025PR03
Regular replenishment
2Rp 206,56129 Nov 202511 d
11 Oct 2025PR03
Regular replenishment
1Rp 214,69905 Nov 202525 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
12 Apr 2026EmergencyPX_KC-801KC-801 high vibration
12 Jul 2025LowPX_KC-801KC-801 bearing temp high
05 May 2025MediumPX_PP-1967APainting PP-1967A

Recent goods issues

Posting dateQtyOrderOrder type
21 Sept 20261201000036455Corrective