OIL,LUBRICANT,ISO VG 46,MINERAL,5L

Material 4100108503 · OIL · Plant 1000

BMaintainCritical insurance spare
Material
4100108503
Category
OIL
Base unit
L
MRP type
Stock Item
Criticality
B (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
24 d · P80 36 d
Unit price
Rp 157,448 (est.)

Recommendation

  • 1.Forecast 0.1 L/year: 0.1 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~24 days; expected demand during lead time 0.0.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 11.
  • 4.No issue in 17 months, but it protects critical equipment: keep it.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Price estimatedLead time estimatedSame description as 2 other material numbers
On hand / on order
6 / 0
no open PO
Today Min / Max
2 / 5
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
11
order qty 11
Service level
99.9%
stockout risk now 0%
Unit price
Rp 157,448
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 546,270/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~13 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1939
BFW PUMP
B100.19

Lead time and procurement

Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Never issued in the 17-month history.