OIL,LUBRICANT,ISO VG 220,SYNTHETIC,209L
Material 4100108636 · OIL · Plant 1000
ATransferNormalSlow-moving
- Material
- 4100108636
- Category
- OIL
- Base unit
- L
- MRP type
- Stock Item
- Criticality
- A (2 of 2 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 24 d · P80 36 d
- Unit price
- Rp 157,448 (est.)
Recommendation
- 1.Forecast 32 L/year: 30 unplanned (credibility blend: own history + installed-base prior) + 2.1 from the maintenance plan.
- 2.Lead time ~24 days; expected demand during lead time 2.0.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 40, order up to 73.
- 4.On hand 4 + on order 0 is at or below the reorder point: 69 needed.
- 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
- 6.Identical part 4100107016 holds spare stock: transfer 69 L instead of buying — no purchase needed.
Price estimatedLead time estimatedSame description as 1 other material number
On hand / on order
4 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
40
safety stock 39
Rec. Max
73
order qty 33
Service level
100.0%
stockout risk now 9%
Unit price
Rp 157,448
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 287 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 418.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.
Installed on 2 functional locations
2 with criticality A/B · 2 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1819A SLOP OIL PUMP | A | 1 | 5 | 1.90 |
| PX_KC-225D INHIBITOR COMPRESSOR | B | 1 | 9 | 2.71 |
Lead time and procurement
Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
| Due | FuncLoc | Job | Qty |
|---|---|---|---|
| 05 Jan 2027 | PX_PP-1819A | Lube oil change | 0.72 |
| 07 May 2027 | PX_PP-1819A | Lube oil change | 0.72 |
| 06 Sept 2027 | PX_PP-1819A | Lube oil change | 0.72 |
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 11 Sept 2026 | Low | PX_KC-225D | KC-225D lube oil filter DP high |
| 22 Aug 2026 | Low | PX_KC-225D | Install scaffolding at KC-225D |
| 27 Jul 2026 | Low | PX_KC-225D | Painting KC-225D |
| 04 Jul 2026 | Medium | PX_PP-1819A | PP-1819A abnormal noise |
| 21 Jun 2026 | Low | PX_PP-1819A | [MSI-B-26-NPM-141] Permanent repair |
| 20 Jun 2026 | Medium | PX_KC-225D | Inspect coupling KC-225D |
| 07 Jun 2026 | High | PX_KC-225D | KC-225D high vibration |
| 18 May 2026 | High | PX_PP-1819A | PP-1819A seal leak |
| 14 Mar 2026 | Medium | PX_KC-225D | Install scaffolding at KC-225D |
| 05 Mar 2026 | Low | PX_KC-225D | KC-225D lube oil filter DP high |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 18 Dec 2025 | 20 | 201000001737 | Corrective |