Sparely
DU

OIL,LUBRICANT,ISO VG 32,MINERAL,1L

Material 4100108685 · OIL · Plant 1000

ATransferCriticalStockout
Material
4100108685
Category
OIL
Base unit
L
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
24 d · P80 36 d
Unit price
Rp 157,448 (est.)

Recommendation

  • 1.Forecast 4.9 L/year: 0.6 unplanned (installed-base failure prior (no history)) + 4.3 from the maintenance plan.
  • 2.Lead time ~24 days; expected demand during lead time 0.8 (incl. 0.7 planned).
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 12, order up to 23.
  • 4.On hand 0 + on order 0 is at or below the reorder point: 23 needed.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
  • 6.Identical part 4100107132 holds spare stock: transfer 23 L instead of buying — no purchase needed.
Planned demand in lead timePrice estimatedLead time estimatedSame description as 1 other material number
On hand / on order
0 / 0
no open PO
Today Min / Max
10 / 20
static parameters in BoM
Rec. Min (reorder point)
12
safety stock 12
Rec. Max
23
order qty 11
Service level
100.0%
stockout risk now 100%
Unit price
Rp 157,448
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 2 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 15.7M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~13 days.

Installed on 3 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-235D
DEMIN WATER FAN
A121.00
PX_PP-1063
C4 PRODUCT PUMP
A100.19
PX_PP-1720D
METHANOL PUMP
C100.19

Lead time and procurement

Lead time 24 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

DueFuncLocJobQty
01 Oct 2026PX_PP-1720DLube oil change0.72
30 Oct 2026PX_PP-1063Lube oil change0.72
31 Jan 2027PX_PP-1720DLube oil change0.72
01 Mar 2027PX_PP-1063Lube oil change0.72
02 Jun 2027PX_PP-1720DLube oil change0.72
01 Jul 2027PX_PP-1063Lube oil change0.72

Recent notifications on its equipment

DatePriorityFuncLocDescription
11 Nov 2025MediumPX_KC-235DLeak from packing
16 May 2025LowPX_KC-235DLeak from packing

Recent goods issues

Never issued in the 17-month history.