TERMINAL,LUG,FORK,2X6MM,CRIMP
Material 4200000144 · TERMINAL · Plant 1000
AMonitorHealthy
- Material
- 4200000144
- Category
- TERMINAL
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (19 of 35 FuncLocs A/B)
- Supplier
- PRIMA LOGAM SENTOSA PT
- Lead time
- 18 d · P80 23 d
- Unit price
- Rp 1,310
Recommendation
- 1.Forecast 9,986 EA/year: 9,986 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~18 days; expected demand during lead time 487.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 1,572, order up to 11,559.
- 4.Installed on 35 FuncLoc(s), 19 of them criticality A/B.
- 5.ML early warning: 100% probability of demand in the next 90 days.
ML early warningLast turnaround used 1,120Single sourceAbnormal consumptionSame description as 1 other material number
On hand / on order
2,507 / 0
no open PO
Today Min / Max
2,000 / 3,102
static parameters in BoM
Rec. Min (reorder point)
1,572
safety stock 1,086
Rec. Max
11,559
order qty 9,987
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1,310
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 21 issue days in the last 180 days, last issue 1 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 10 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (1,720 units) excluded from the baseline.
Demand pattern Erratic · 96 issue days · 13 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 11.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~9 days.
Installed on 35 functional locations
19 with criticality A/B · 39 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1121-M MOTOR FOR PP-1121 | A | 3 | 2 | 1.05 |
| PX_PP-1892B-CSS CONTROL SWITCH STATION FOR PP-1892B-M | A | 1 | 1 | 0.19 |
| PY_PP-490-M MOTOR FOR PP-490 | A | 1 | 1 | 0.19 |
| PX_JBX-1363 JUNCTION BOX | A | 3 | 0 | 0.01 |
| PX_KC-365C-M MOTOR FOR KC-365C | A | 1 | 0 | 0.57 |
| PX_PP-1366A-CSS CONTROL SWITCH STATION FOR PP-1366A-M | A | 1 | 0 | 0.19 |
| PX_PP-1659A-M MOTOR FOR PP-1659A | A | 1 | 0 | 0.19 |
| PX_PP-1905A-M MOTOR FOR PP-1905A | A | 1 | 0 | 0.19 |
| PX_PP-439B-M MOTOR FOR PP-439B | A | 1 | 0 | 0.19 |
| PX_JBX-1893A JUNCTION BOX | B | 1 | 0 | 0.01 |
| PX_KC-885A-M MOTOR FOR KC-885A | B | 1 | 0 | 0.57 |
| PX_PP-1396A-CSS CONTROL SWITCH STATION FOR PP-1396A-M | B | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 18 ± 11 days (PO history, 29 PO lines) · on-time 44%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 15 Sept 2026 | PR03 Regular replenishment | 17,576 | Rp 1,369 | 26 Sept 2026 | 11 d |
| 20 Aug 2026 | PR03 Regular replenishment | 12,912 | Rp 1,273 | 31 Aug 2026 | 11 d |
| 11 Aug 2026 | PR03 Regular replenishment | 8,022 | Rp 1,312 | 31 Aug 2026 | 20 d |
| 10 Aug 2026 | PR03 Regular replenishment | 14,755 | Rp 1,332 | 23 Aug 2026 | 13 d |
| 06 Aug 2026 | PR03 Regular replenishment | 21,504 | Rp 1,368 | 24 Aug 2026 | 18 d |
| 18 Jul 2026 | PR03 Regular replenishment | 16,974 | Rp 1,310 | 31 Jul 2026 | 13 d |
| 10 Jul 2026 | PR03 Regular replenishment | 18,398 | Rp 1,305 | 25 Jul 2026 | 15 d |
| 13 Jun 2026 | PR06 Regular replenishment | 6,962 | Rp 1,316 | 22 Jun 2026 | 9 d |
| 27 May 2026 | PR05 Project / turnaround | 21,791 | Rp 1,280 | 26 Jul 2026 | 60 d |
| 10 Apr 2026 | PR03 Regular replenishment | 6,048 | Rp 1,373 | 06 May 2026 | 26 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 06 Mar 2026 | Medium | PX_JBX-1817B | Replace gland JBX-1817B |
| 26 Nov 2025 | Medium | PX_PP-1337-M | Megger test PP-1337-M |
| 22 Nov 2025 | High | PX_PP-1121-M | Replace lamp as per PM finding |
| 07 Aug 2025 | Medium | PX_JBX-1784A | Leak from packing |
| 25 Jul 2025 | Medium | PX_PP-1121-M | Megger test PP-1121-M |
| 26 May 2025 | Medium | PY_PP-490-M | PSM25/PP-490-M high temp |
| 23 May 2025 | Low | PX_PP-1337-M | PSM25/Install cover plate for MCP cracki |
| 16 May 2025 | Low | PX_JBX-1817B | Painting JBX-1817B |
| 14 May 2025 | Medium | PX_PP-1892B-CSS | Leak from packing |
| 10 May 2025 | Medium | PX_PP-591A-M | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Sept 2026 | 50 | 201000025027 | Corrective |
| 30 Sept 2026 | 20 | 201000031410 | Corrective |
| 13 Sept 2026 | 5,000 | 201000010235 | Corrective |
| 10 Sept 2026 | 1,000 | 201000016998 | Corrective |
| 14 Aug 2026 | 100 | 201000016927 | Corrective |
| 13 Aug 2026 | 500 | 201000016927 | Corrective |
| 13 Aug 2026 | 100 | 209000023087 | Other maintenance |
| 27 Jul 2026 | 50 | 201000027402 | Corrective |
| 26 Jul 2026 | 200 | 201000014397 | Corrective |
| 08 Jul 2026 | 1,000 | 201000012424 | Corrective |
| 08 Jul 2026 | 20 | 204000002628 | Preventive |
| 20 Jun 2026 | 200 | 209000014083 | Other maintenance |
| 12 Jun 2026 | 20 | 201000016926 | Corrective |
| 10 Jun 2026 | 20 | 201000028417 | Corrective |
| 09 Jun 2026 | 5,000 | 201000003949 | Corrective |