TERMINAL,LUG,RING,5.5X6MM,CRIMP
Material 4200000149 · TERMINAL · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4200000149
- Category
- TERMINAL
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (10 of 20 FuncLocs A/B)
- Supplier
- RAJAWALI INDUSTRI ABADI PT
- Lead time
- 31 d · P80 41 d
- Unit price
- Rp 9,884
Recommendation
- 1.Forecast 5,844 EA/year: 5,844 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~31 days; expected demand during lead time 496.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 2,035, order up to 5,014.
- 4.On hand 513 + on order 0 is at or below the reorder point: order 4,501 now.
- 5.Installed on 20 FuncLoc(s), 10 of them criticality A/B.
- 6.ML early warning: 99% probability of demand in the next 90 days.
Proposed purchase requisition
4,501 EA
Rp 44.5M · order by 01 Oct 2026
Expected arrival ≈ 31 days
ML early warningLast turnaround used 100Single sourceAbnormal consumption
On hand / on order
513 / 0
no open PO
Today Min / Max
398 / 1,188
static parameters in BoM
Rec. Min (reorder point)
2,035
safety stock 1,539
Rec. Max
5,014
order qty 2,979
Service level
99.9%
stockout risk now 49%
Unit price
Rp 9,884
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 13 issue days in the last 180 days, last issue 5 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 4 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (170 units) excluded from the baseline.
Demand pattern Erratic · 62 issue days · 14 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 7.0B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~9 days.
Installed on 20 functional locations
10 with criticality A/B · 24 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_KC-365C-M MOTOR FOR KC-365C | A | 1 | 0 | 0.57 |
| PX_PP-103A-M MOTOR FOR PP-103A | A | 1 | 0 | 0.19 |
| PX_PP-200D-M MOTOR FOR PP-200D | A | 1 | 0 | 0.19 |
| PX_PP-536-M MOTOR FOR PP-536 | A | 1 | 0 | 0.19 |
| PX_PP-720-M MOTOR FOR PP-720 | A | 1 | 0 | 0.19 |
| PX_PP-1718-M MOTOR FOR PP-1718 | B | 1 | 1 | 0.62 |
| PX_PP-1964B-CSS CONTROL SWITCH STATION FOR PP-1964B-M | B | 1 | 1 | 0.19 |
| PX_PP-1612-M MOTOR FOR PP-1612 | B | 1 | 0 | 0.19 |
| PX_PP-1749A-M MOTOR FOR PP-1749A | B | 1 | 0 | 0.19 |
| PX_PP-310C-M MOTOR FOR PP-310C | B | 4 | 0 | 0.19 |
| PX_JBX-1112 JUNCTION BOX | C | 1 | 0 | 0.01 |
| PX_PP-1115-M MOTOR FOR PP-1115 | C | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 31 ± 19 days (PO history, 24 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 22 Jun 2026 | PR06 Regular replenishment | 3,130 | Rp 10,291 | 20 Jul 2026 | 28 d |
| 22 May 2026 | PR03 Regular replenishment | 2,313 | Rp 10,066 | 17 Jun 2026 | 26 d |
| 17 Apr 2026 | PR06 Regular replenishment | 3,959 | Rp 9,657 | 08 May 2026 | 21 d |
| 09 Apr 2026 | PR06 Regular replenishment | 7,079 | Rp 10,288 | 09 May 2026 | 30 d |
| 03 Mar 2026 | PR03 Regular replenishment | 3,168 | Rp 10,318 | 14 Apr 2026 | 42 d |
| 25 Feb 2026 | PR04 Regular (other) | 3,428 | Rp 9,877 | 25 Mar 2026 | 28 d |
| 15 Jan 2026 | PR03 Regular replenishment | 4,485 | Rp 9,629 | 22 Mar 2026 | 66 d |
| 11 Jan 2026 | PR05 Project / turnaround | 5,867 | Rp 10,152 | 17 Apr 2026 | 96 d |
| 05 Jan 2026 | PR03 Regular replenishment | 2,991 | Rp 9,595 | 22 Jan 2026 | 17 d |
| 21 Nov 2025 | PR06 Regular replenishment | 2,596 | Rp 9,636 | 20 Jan 2026 | 60 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 19 Aug 2025 | Low | PX_PP-1718-M | PP-1718-M bearing noise |
| 10 May 2025 | Low | PX_PP-1964B-CSS | Leak from packing |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 26 Sept 2026 | 100 | 201000005210 | Corrective |
| 26 Sept 2026 | 20 | 203000034378 | Turnaround |
| 25 Aug 2026 | 50 | 201000007466 | Corrective |
| 26 Jul 2026 | 20 | 201000036220 | Corrective |
| 13 Jul 2026 | 50 | 201000000855 | Corrective |
| 13 Jul 2026 | 20 | 201000000855 | Corrective |
| 11 Jul 2026 | 200 | 201000000779 | Corrective |
| 11 Jul 2026 | 50 | 201000020581 | Corrective |
| 05 Jul 2026 | 500 | 201000014535 | Corrective |
| 25 Jun 2026 | 20 | 201000031485 | Corrective |
| 21 Jun 2026 | 20 | 201000022261 | Corrective |
| 15 Jun 2026 | 50 | 204000008401 | Preventive |
| 14 May 2026 | 50 | 201000007315 | Corrective |
| 02 May 2026 | 500 | 201000010660 | Corrective |
| 21 Apr 2026 | 1,000 | 201000039223 | Corrective |