TERMINAL,LUG,PIN,5.5X6MM,CRIMP

Material 4200000178 · TERMINAL · Plant 1000

AReduceExcess
Material
4200000178
Category
TERMINAL
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 14 FuncLocs A/B)
Supplier
GEMILANG SEJAHTERA NUSANTARA PT
Lead time
15 d · P80 18 d
Unit price
Rp 2,086

Recommendation

  • 1.Forecast 5,193 EA/year: 5,193 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~15 days; expected demand during lead time 212.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 1,187, order up to 6,380.
  • 4.Stock 6,904 exceeds the level to keep (6,380) by 524.
  • 5.Installed on 14 FuncLoc(s), 4 of them criticality A/B.
  • 6.ML early warning: 99% probability of demand in the next 90 days.
ML early warningLast turnaround used 170Single sourceAbnormal consumption
On hand / on order
6,904 / 0
no open PO
Today Min / Max
2,000 / 3,005
static parameters in BoM
Rec. Min (reorder point)
1,187
safety stock 976
Rec. Max
6,380
order qty 5,193
Service level
100.0%
stockout risk now 0%
Unit price
Rp 2,086
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 8 issue days in the last 180 days, last issue 14 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (190 units) excluded from the baseline.

Demand pattern Erratic · 37 issue days · 8 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~9 days.

Installed on 14 functional locations

4 with criticality A/B · 16 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1760A-M
MOTOR FOR PP-1760A
A100.19
PX_PP-1939-M
MOTOR FOR PP-1939
A100.19
PX_PP-494C-M
MOTOR FOR PP-494C
A100.19
PX_PP-847B-M
MOTOR FOR PP-847B
B100.19
PX_PP-479-M
MOTOR FOR PP-479
C130.62
PY_PP-598-M
MOTOR FOR PP-598
C110.62
PX_JBX-1190A
JUNCTION BOX
C300.01
PX_JBX-1200A
JUNCTION BOX (EXP)
C100.01
PX_KC-155-M
MOTOR FOR KC-155
C100.57
PX_PP-1139-CSS
CONTROL SWITCH STATION FOR PP-1139-M
C100.19
PX_PP-1785A-CSS
CONTROL SWITCH STATION FOR PP-1785A-M
C100.19
PY_1579-7660-F28
SPARE SLOT
C100.01

Lead time and procurement

Lead time 15 ± 7 days (PO history, 10 PO lines) · on-time 50%

PR dateTypeQtyUnit priceDeliveryLead time
08 Aug 2026PR06
Regular replenishment
15,639Rp 2,01320 Aug 202612 d
20 Jul 2026PR03
Regular replenishment
9,446Rp 2,08701 Aug 202612 d
05 Apr 2026PR03
Regular replenishment
7,330Rp 1,99814 Apr 20269 d
08 Mar 2026PR03
Regular replenishment
13,331Rp 2,08516 Mar 20268 d
18 Feb 2026PR06
Regular replenishment
10,741Rp 2,11208 Mar 202618 d
29 Jan 2026PR03
Regular replenishment
11,838Rp 2,11216 Feb 202618 d
06 Sept 2025PR03
Regular replenishment
9,967Rp 2,05712 Sept 20256 d
03 Aug 2025PR03
Regular replenishment
14,730Rp 2,01025 Aug 202522 d
02 Jul 2025PR03
Regular replenishment
9,165Rp 2,09112 Jul 202510 d
15 May 2025PR06
Regular replenishment
12,180Rp 2,12831 May 202516 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Jan 2026MediumPX_PP-479-MPainting PP-479-M
21 Nov 2025MediumPX_PP-479-MReplace lamp as per PM finding
23 Jul 2025MediumPY_PP-598-MLeak from packing
22 May 2025LowPX_PP-479-MMegger test PP-479-M

Recent goods issues

Posting dateQtyOrderOrder type
17 Sept 20261,000209000036917Other maintenance
07 Aug 2026100201000005043Corrective
16 Jul 202650201000019779Corrective
13 Jul 202620201000029732Corrective
11 Jul 202620201000013402Corrective
15 Jun 2026100201000038458Corrective
06 Jun 202650209000008419Other maintenance
25 Apr 202650201000008643Corrective
28 Feb 2026200204000013843Preventive
02 Feb 202650201000032240Corrective
27 Jan 20265,000201000005548Corrective
27 Jan 202620201000020819Corrective
22 Jan 2026500201000025721Corrective
19 Jan 202620201000009011Corrective
18 Jan 2026500201000026808Corrective