Sparely
DU

TERMINAL,LUG,RING,5.5X4MM,CRIMP

Material 4200000202 · TERMINAL · Plant 1000

AMaintainHealthy
Material
4200000202
Category
TERMINAL
Base unit
EA
MRP type
Stock Item
Criticality
A (5 of 14 FuncLocs A/B)
Supplier
SAMUDRA INSTRUMEN JAYA PT
Lead time
21 d · P80 30 d
Unit price
Rp 1,120

Recommendation

  • 1.Forecast 2,405 EA/year: 2,405 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~21 days; expected demand during lead time 139.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 798, order up to 3,203.
  • 4.Installed on 14 FuncLoc(s), 5 of them criticality A/B.
  • 5.ML early warning: 99% probability of demand in the next 90 days.
ML early warningLast turnaround used 570Single source
On hand / on order
2,071 / 0
no open PO
Today Min / Max
1,179 / 2,487
static parameters in BoM
Rec. Min (reorder point)
798
safety stock 659
Rec. Max
3,203
order qty 2,405
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1,120
PO history
ML early warning: 99% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 6 issue days in the last 180 days, last issue 1 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (570 units) excluded from the baseline.

Demand pattern Erratic · 24 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 2.9B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~9 days.

Installed on 14 functional locations

5 with criticality A/B · 16 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-494C-M
MOTOR FOR PP-494C
A100.19
PX_JBX-1893A
JUNCTION BOX
B100.01
PX_PP-1540-M
MOTOR FOR PP-1540
B100.19
PX_PP-1612-M
MOTOR FOR PP-1612
B100.19
PX_PP-370B-M
MOTOR FOR PP-370B
B100.19
PX_JBX-1615A
JUNCTION BOX
C200.01
PX_KC-879A-M
MOTOR FOR KC-879A
C100.57
PX_PP-1638B-M
MOTOR FOR PP-1638B
C100.19
PX_PP-246C-CSS
CONTROL SWITCH STATION FOR PP-246C-M
C200.19
PX_PP-311C-M
MOTOR FOR PP-311C
C100.19
PX_PP-497-CSS
CONTROL SWITCH STATION FOR PP-497-M
C100.19
PX_PP-731A-M
MOTOR FOR PP-731A
C100.19

Lead time and procurement

Lead time 21 ± 10 days (PO history, 12 PO lines) · on-time 37%

PR dateTypeQtyUnit priceDeliveryLead time
20 Aug 2026PR06
Regular replenishment
1,091Rp 1,12525 Sept 202636 d
17 Apr 2026PR06
Regular replenishment
1,173Rp 1,12312 May 202625 d
08 Apr 2026PR03
Regular replenishment
1,898Rp 1,10723 Apr 202615 d
15 Mar 2026PR03
Regular replenishment
1,506Rp 1,15614 Apr 202630 d
10 Mar 2026PR03
Regular replenishment
1,618Rp 1,08029 Mar 202619 d
18 Feb 2026PR05
Project / turnaround
1,594Rp 1,15920 Mar 202630 d
29 Dec 2025PR03
Regular replenishment
1,257Rp 1,09615 Jan 202617 d
15 Dec 2025PR06
Regular replenishment
1,676Rp 1,11729 Dec 202514 d
28 Oct 2025PR03
Regular replenishment
756Rp 1,13227 Nov 202530 d
23 Sept 2025PR06
Regular replenishment
961Rp 1,12507 Oct 202514 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 202620201000006629Corrective
16 Aug 2026500204000022610Preventive
06 Jul 2026500201000013211Corrective
02 Jul 202620201000009466Corrective
18 Jun 2026200201000010446Corrective
11 Jun 2026200209000014321Other maintenance
14 Feb 202620201000014966Corrective
04 Feb 2026200201000018578Corrective
31 Jan 202650201000032440Corrective
20 Jan 2026200201000009068Corrective
11 Jan 202650201000011748Corrective
08 Jan 202650203000006950Turnaround
06 Jan 2026500201000037293Corrective
01 Jan 2026100201000008376Corrective
24 Dec 2025200203000001878Turnaround