Sparely
DU

TERMINAL,LUG,PIN,5.5X4MM,CRIMP

Material 4200000228 · TERMINAL · Plant 1000

AReorderCriticalBelow reorder point
Material
4200000228
Category
TERMINAL
Base unit
EA
MRP type
Non Stock
Criticality
A (8 of 11 FuncLocs A/B)
Supplier
KARYA REFRAKTORI ABADI PT
Lead time
15 d · P80 16 d
Unit price
Rp 2,231

Recommendation

  • 1.Forecast 2,258 EA/year: 2,258 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~15 days; expected demand during lead time 90.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 417, order up to 2,676.
  • 4.On hand 79 + on order 0 is at or below the reorder point: order 2,597 now.
  • 5.Installed on 11 FuncLoc(s), 8 of them criticality A/B.
  • 6.ML early warning: 100% probability of demand in the next 90 days.
Proposed purchase requisition
2,597 EA
Rp 5.8M · order by 01 Oct 2026
Expected arrival ≈ 15 days
ML early warningConvert to Stock ItemLast turnaround used 100Single sourceAbnormal consumption
On hand / on order
79 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
417
safety stock 328
Rec. Max
2,676
order qty 2,259
Service level
99.9%
stockout risk now 66%
Unit price
Rp 2,231
PO history
ML early warning: 100% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 13 issue days in the last 180 days, last issue 17 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 6 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (120 units) excluded from the baseline.

Demand pattern Erratic · 43 issue days · 5 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 5.2B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~9 days.

Installed on 11 functional locations

8 with criticality A/B · 20 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_JBX-1662B
JUNCTION BOX (EXP)
A200.01
PX_PP-1101A-M
MOTOR FOR PP-1101A
A100.19
PX_PP-1659A-M
MOTOR FOR PP-1659A
A100.19
PX_PP-1752A-CSS
CONTROL SWITCH STATION FOR PP-1752A-M
A400.19
PX_PP-1805A-M
MOTOR FOR PP-1805A
A200.19
PX_PP-506A-M
MOTOR FOR PP-506A
A300.19
PX_KC-593C-M
MOTOR FOR KC-593C
B100.57
PX_PP-688-M
MOTOR FOR PP-688
B100.19
PX_PP-744B-M
MOTOR FOR PP-744B
C320.19
PX_JBX-666B
JUNCTION BOX
C100.01
PY_1892-4524-F34-A
FIELD DEVICE
C100.01

Lead time and procurement

Lead time 15 ± 12 days (PO history, 16 PO lines) · on-time 56%

PR dateTypeQtyUnit priceDeliveryLead time
13 Sept 2026PR06
Regular replenishment
3,460Rp 2,18520 Sept 20267 d
31 Jul 2026PR03
Regular replenishment
6,707Rp 2,33905 Aug 20265 d
23 Jul 2026PR05
Project / turnaround
6,274Rp 2,22016 Aug 202624 d
23 Jun 2026PR06
Regular replenishment
3,396Rp 2,16604 Jul 202611 d
01 Jun 2026PR06
Regular replenishment
4,033Rp 2,22406 Jun 20265 d
10 Apr 2026PR06
Regular replenishment
5,815Rp 2,33316 Apr 20266 d
31 Jan 2026PR06
Regular replenishment
5,618Rp 2,23810 Feb 202610 d
21 Dec 2025PR06
Regular replenishment
5,659Rp 2,16329 Dec 20258 d
20 Dec 2025PR05
Project / turnaround
3,618Rp 2,19619 Jan 202630 d
19 Oct 2025PR06
Regular replenishment
4,971Rp 2,26804 Nov 202516 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
06 Aug 2026LowPX_PP-744B-MPainting PP-744B-M
11 May 2025MediumPX_PP-744B-MPP-744B-M bearing noise

Recent goods issues

Posting dateQtyOrderOrder type
14 Sept 202650201000001040Corrective
24 Aug 202620205000013355Other maintenance
11 Aug 2026100209000023087Other maintenance
02 Aug 202620201000026506Corrective
30 Jul 202650201000035181Corrective
24 Jul 20265,000201000024842Corrective
08 Jul 202620209000029244Other maintenance
22 Jun 2026100201000016655Corrective
13 Jun 2026200201000008577Corrective
10 Jun 202620204000036765Preventive
01 Jun 202650201000033522Corrective
23 Apr 202650201000036349Corrective
19 Apr 2026500201000028316Corrective
23 Mar 2026500201000008585Corrective
17 Feb 202650201000000279Corrective