TERMINAL,LUG,PIN,8X5MM,CRIMP
Material 4200000264 · TERMINAL · Plant 1000
AMonitorHealthy
- Material
- 4200000264
- Category
- TERMINAL
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 4 FuncLocs A/B)
- Supplier
- KARYA REFRAKTORI ABADI PT
- Lead time
- 20 d · P80 27 d
- Unit price
- Rp 1,310
Recommendation
- 1.Forecast 1,597 EA/year: 1,597 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~20 days; expected demand during lead time 86.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 469, order up to 2,066.
- 4.Installed on 4 FuncLoc(s), 2 of them criticality A/B.
- 5.ML early warning: 97% probability of demand in the next 90 days.
ML early warningLast turnaround used 770Single sourceAbnormal consumption
On hand / on order
1,062 / 0
no open PO
Today Min / Max
774 / 1,357
static parameters in BoM
Rec. Min (reorder point)
469
safety stock 384
Rec. Max
2,066
order qty 1,597
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1,310
PO history
ML early warning: 97% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 6 issue days in the last 180 days, last issue 4 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (5,790 units) excluded from the baseline.
Demand pattern Erratic · 24 issue days · 4 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.6B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~9 days.
Installed on 4 functional locations
2 with criticality A/B · 4 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-287D-M MOTOR FOR PP-287D | A | 1 | 0 | 0.19 |
| PX_PP-743D-M MOTOR FOR PP-743D | B | 1 | 0 | 0.19 |
| PX_PP-497-CSS CONTROL SWITCH STATION FOR PP-497-M | C | 1 | 0 | 0.19 |
| UT_PP-641A-M MOTOR FOR PP-641A | C | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 20 ± 10 days (PO history, 16 PO lines) · on-time 56%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 13 Jul 2026 | PR04 Regular (other) | 1,987 | Rp 1,340 | 02 Aug 2026 | 20 d |
| 01 Jun 2026 | PR03 Regular replenishment | 4,002 | Rp 1,353 | 28 Jun 2026 | 27 d |
| 08 Apr 2026 | PR06 Regular replenishment | 4,967 | Rp 1,344 | 27 Apr 2026 | 19 d |
| 24 Mar 2026 | PR01 Import / long-lead | 3,870 | Rp 1,257 | 04 May 2026 | 41 d |
| 03 Feb 2026 | PR06 Regular replenishment | 2,813 | Rp 1,305 | 08 Feb 2026 | 5 d |
| 29 Jan 2026 | PR05 Project / turnaround | 4,061 | Rp 1,326 | 25 Feb 2026 | 27 d |
| 26 Jan 2026 | PR03 Regular replenishment | 3,675 | Rp 1,348 | 18 Feb 2026 | 23 d |
| 20 Jan 2026 | PR03 Regular replenishment | 2,374 | Rp 1,349 | 10 Feb 2026 | 21 d |
| 22 Dec 2025 | PR03 Regular replenishment | 2,917 | Rp 1,283 | 09 Jan 2026 | 18 d |
| 26 Oct 2025 | PR03 Regular replenishment | 4,113 | Rp 1,245 | 15 Nov 2025 | 20 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 Sept 2026 | 100 | 201000005010 | Corrective |
| 06 Sept 2026 | 5,000 | 203000008243 | Turnaround |
| 19 Jun 2026 | 20 | 201000024332 | Corrective |
| 08 Jun 2026 | 100 | 201000007891 | Corrective |
| 05 Jun 2026 | 50 | 209000018653 | Other maintenance |
| 20 May 2026 | 50 | 201000006538 | Corrective |
| 17 May 2026 | 50 | 201000026522 | Corrective |
| 01 Feb 2026 | 100 | 201000004674 | Corrective |
| 20 Jan 2026 | 1,000 | 201000000305 | Corrective |
| 19 Jan 2026 | 20 | 201000024159 | Corrective |
| 07 Jan 2026 | 500 | 201000024982 | Corrective |
| 29 Dec 2025 | 20 | 203000006078 | Turnaround |
| 29 Dec 2025 | 500 | 203000036002 | Turnaround |
| 17 Dec 2025 | 50 | 201000029522 | Corrective |
| 06 Dec 2025 | 200 | 203000014228 | Turnaround |