TERMINAL,LUG,PIN,2X4MM,CRIMP
Material 4200000310 · TERMINAL · Plant 1000
AReorderCriticalStockout
- Material
- 4200000310
- Category
- TERMINAL
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (3 of 8 FuncLocs A/B)
- Supplier
- GEMILANG INDUSTRI PERSADA PT
- Lead time
- 25 d · P80 32 d
- Unit price
- Rp 9,032
Recommendation
- 1.Forecast 1,601 EA/year: 1,601 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~25 days; expected demand during lead time 107.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 604, order up to 2,206.
- 4.On hand 0 + on order 562 is at or below the reorder point: order 1,644 now.
- 5.Installed on 8 FuncLoc(s), 3 of them criticality A/B.
- 6.ML early warning: 98% probability of demand in the next 90 days.
Proposed purchase requisition
1,644 EA
Rp 14.8M · order by 01 Oct 2026
Expected arrival ≈ 25 days
ML early warningConvert to Stock ItemLast turnaround used 50Single sourceAbnormal consumptionOpen PO
On hand / on order
0 / 562
next delivery 11 Oct 2026
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
604
safety stock 497
Rec. Max
2,206
order qty 1,602
Service level
99.9%
stockout risk now 1%
Unit price
Rp 9,032
PO history
ML early warning: 98% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 6 issue days in the last 180 days, last issue 13 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 6 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (50 units) excluded from the baseline.
Demand pattern Lumpy · 17 issue days · 4 abnormal issue(s) capped · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 2.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~9 days.
Installed on 8 functional locations
3 with criticality A/B · 9 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-140C-M MOTOR FOR PP-140C | A | 2 | 0 | 0.19 |
| PX_JBX-1713B JUNCTION BOX (EXP) | B | 1 | 0 | 0.01 |
| PY_8143-6957-F11-A FIELD DEVICE | B | 1 | 0 | 0.01 |
| PX_PP-1181B-M MOTOR FOR PP-1181B | C | 1 | 0 | 0.19 |
| PX_PP-1678A-M MOTOR FOR PP-1678A | C | 1 | 0 | 0.19 |
| PX_PP-683A-CSS CONTROL SWITCH STATION FOR PP-683A-M | C | 1 | 0 | 0.19 |
| PY_3302-4988B-F38-B MARSHALLING TERMINAL | C | 1 | 0 | 0.01 |
| PY_PP-1398C-M MOTOR FOR PP-1398C | S | 1 | 3 | 0.19 |
Lead time and procurement
Lead time 25 ± 11 days (PO history, 16 PO lines) · on-time 38%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 17 Sept 2026 | PR05 Project / turnaround | 562 | Rp 9,153 | 11 Oct 2026 open | 24 d |
| 16 Jul 2026 | PR03 Regular replenishment | 1,678 | Rp 9,121 | 28 Aug 2026 | 43 d |
| 13 Jun 2026 | PR06 Regular replenishment | 553 | Rp 8,817 | 30 Jun 2026 | 17 d |
| 12 May 2026 | PR06 Regular replenishment | 2,103 | Rp 8,943 | 10 Jun 2026 | 29 d |
| 25 Apr 2026 | PR03 Regular replenishment | 1,803 | Rp 8,872 | 20 May 2026 | 25 d |
| 16 Apr 2026 | PR03 Regular replenishment | 2,056 | Rp 8,816 | 02 May 2026 | 16 d |
| 17 Mar 2026 | PR05 Project / turnaround | 1,859 | Rp 9,258 | 03 Apr 2026 | 17 d |
| 19 Jan 2026 | PR06 Regular replenishment | 888 | Rp 8,825 | 26 Feb 2026 | 38 d |
| 26 Dec 2025 | PR05 Project / turnaround | 687 | Rp 9,483 | 12 Jan 2026 | 17 d |
| 07 Nov 2025 | PR06 Regular replenishment | 1,035 | Rp 9,081 | 23 Nov 2025 | 16 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 28 Aug 2026 | Low | PY_PP-1398C-M | Install scaffolding at PP-1398C-M |
| 23 Aug 2025 | Low | PY_PP-1398C-M | Painting PP-1398C-M |
| 07 May 2025 | Low | PY_PP-1398C-M | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 18 Sept 2026 | 50 | 209000036917 | Other maintenance |
| 11 Aug 2026 | 100 | 209000023087 | Other maintenance |
| 13 Jul 2026 | 1,000 | 201000028281 | Corrective |
| 28 Apr 2026 | 200 | 201000019885 | Corrective |
| 21 Apr 2026 | 20 | 201000013636 | Corrective |
| 14 Apr 2026 | 100 | 201000025702 | Corrective |
| 29 Jan 2026 | 50 | 201000013677 | Corrective |
| 29 Jan 2026 | 20 | 201000038343 | Corrective |
| 28 Jan 2026 | 20 | 201000019118 | Corrective |
| 19 Jan 2026 | 100 | 201000037354 | Corrective |
| 22 Dec 2025 | 20 | 201000009100 | Corrective |
| 22 Dec 2025 | 20 | 201000023572 | Corrective |
| 19 Dec 2025 | 50 | 201000004365 | Corrective |
| 08 Dec 2025 | 500 | 201000014160 | Corrective |
| 22 Nov 2025 | 50 | 203000020131 | Turnaround |