TERMINAL,LUG,FORK,5.5X4MM,CRIMP
Material 4200000318 · TERMINAL · Plant 1000
AMonitorInsurance gap
- Material
- 4200000318
- Category
- TERMINAL
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (3 of 6 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 21 d · P80 35 d
- Unit price
- Rp 2,031 (est.)
Recommendation
- 1.Forecast 6.3 EA/year: 6.3 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~21 days; expected demand during lead time 0.4.
- 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 162.
- 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
- 5.Installed on 6 FuncLoc(s), 3 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
162
order qty 162
Service level
99.8%
stockout risk now 0%
Unit price
Rp 2,031
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 7.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~9 days.
Installed on 6 functional locations
3 with criticality A/B · 8 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-136B-M MOTOR FOR PP-136B | A | 1 | 1 | 0.19 |
| PX_PP-390B-M MOTOR FOR PP-390B | A | 1 | 0 | 0.19 |
| PX_PP-1765B-M MOTOR FOR PP-1765B | B | 1 | 0 | 0.19 |
| PX_PP-1369C-CSS CONTROL SWITCH STATION FOR PP-1369C-M | C | 1 | 0 | 0.19 |
| PX_PP-1952C-M MOTOR FOR PP-1952C | C | 3 | 0 | 0.19 |
| PY_1892-4524-F34-A FIELD DEVICE | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 21 ± 13 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 05 May 2025 | Medium | PX_PP-136B-M | PP-136B-M bearing noise |
Recent goods issues
Never issued in the 17-month history.