Sparely
DU

TERMINAL,LUG,FORK,5.5X4MM,CRIMP

Material 4200000318 · TERMINAL · Plant 1000

AMonitorInsurance gap
Material
4200000318
Category
TERMINAL
Base unit
EA
MRP type
Non Stock
Criticality
A (3 of 6 FuncLocs A/B)
Supplier
No PO history
Lead time
21 d · P80 35 d
Unit price
Rp 2,031 (est.)

Recommendation

  • 1.Forecast 6.3 EA/year: 6.3 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~21 days; expected demand during lead time 0.4.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 162.
  • 4.Never issued in 17 months: review with reliability engineering before buying an insurance spare.
  • 5.Installed on 6 FuncLoc(s), 3 of them criticality A/B.
Insurance spare candidatePrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
162
order qty 162
Service level
99.8%
stockout risk now 0%
Unit price
Rp 2,031
Category + unit estimate
ML early warning: 7% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 7.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~9 days.

Installed on 6 functional locations

3 with criticality A/B · 8 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-136B-M
MOTOR FOR PP-136B
A110.19
PX_PP-390B-M
MOTOR FOR PP-390B
A100.19
PX_PP-1765B-M
MOTOR FOR PP-1765B
B100.19
PX_PP-1369C-CSS
CONTROL SWITCH STATION FOR PP-1369C-M
C100.19
PX_PP-1952C-M
MOTOR FOR PP-1952C
C300.19
PY_1892-4524-F34-A
FIELD DEVICE
C100.01

Lead time and procurement

Lead time 21 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
05 May 2025MediumPX_PP-136B-MPP-136B-M bearing noise

Recent goods issues

Never issued in the 17-month history.