Sparely
DU

TERMINAL,LUG,FORK,1.25X4MM,CRIMP

Material 4200000357 · TERMINAL · Plant 1000

AReorderNormalSlow-moving
Material
4200000357
Category
TERMINAL
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
21 d · P80 35 d
Unit price
Rp 2,031 (est.)

Recommendation

  • 1.Forecast 25 EA/year: 25 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~21 days; expected demand during lead time 1.4.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 100, order up to 200.
  • 4.On hand 5 + on order 0 is at or below the reorder point: order 195 now.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
195 EA
Rp 396,045 · order by 01 Oct 2026
Expected arrival ≈ 21 days
Price estimatedLead time estimated
On hand / on order
5 / 0
no open PO
Today Min / Max
3 / 8
static parameters in BoM
Rec. Min (reorder point)
100
safety stock 99
Rec. Max
200
order qty 100
Service level
100.0%
stockout risk now 1%
Unit price
Rp 2,031
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 351 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 48.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~9 days.

Installed on 3 functional locations

2 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1323A-M
MOTOR FOR PP-1323A
A100.19
PX_PP-1881A-M
MOTOR FOR PP-1881A
A100.19
PX_JBX-828A
JUNCTION BOX
C100.01

Lead time and procurement

Lead time 21 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
15 Oct 2025100204000002713Preventive