TERMINAL,LUG,FORK,2X4MM,CRIMP
Material 4200000384 · TERMINAL · Plant 1000
BReorderNormalBelow reorder point
- Material
- 4200000384
- Category
- TERMINAL
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 3 FuncLocs A/B)
- Supplier
- LANGIT SEJAHTERA GLOBAL PT
- Lead time
- 23 d · P80 35 d
- Unit price
- Rp 6,146
Recommendation
- 1.Forecast 1,265 EA/year: 1,265 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~23 days; expected demand during lead time 80.
- 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 1,000, order up to 2,265.
- 4.On hand 194 + on order 0 is at or below the reorder point: order 2,071 now.
- 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2,071 EA
Rp 12.7M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Single source
On hand / on order
194 / 0
no open PO
Today Min / Max
32 / 101
static parameters in BoM
Rec. Min (reorder point)
1,000
safety stock 921
Rec. Max
2,265
order qty 1,265
Service level
99.7%
stockout risk now 8%
Unit price
Rp 6,146
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 1 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 62.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~9 days.
Installed on 3 functional locations
1 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1928-M MOTOR FOR PP-1928 | B | 1 | 3 | 1.05 |
| PX_PP-1574B-M MOTOR FOR PP-1574B | C | 1 | 6 | 1.47 |
| PX_JBX-1779 JUNCTION BOX | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 23 ± 13 days (PO history + category, 1 PO lines) · on-time 71%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 11 May 2026 | PR06 Regular replenishment | 451 | Rp 6,146 | 09 Jun 2026 | 29 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 12 Sept 2026 | High | PX_PP-1928-M | Megger test PP-1928-M |
| 22 Jul 2026 | Low | PX_PP-1574B-M | PP-1574B-M high temp |
| 14 Mar 2026 | Low | PX_PP-1574B-M | Install scaffolding at PP-1574B-M |
| 08 Jan 2026 | Medium | PX_PP-1574B-M | Install scaffolding at PP-1574B-M |
| 11 Dec 2025 | Medium | PX_PP-1574B-M | PP-1574B-M bearing noise |
| 16 Oct 2025 | High | PX_PP-1928-M | PP-1928-M bearing noise |
| 15 Sept 2025 | High | PX_PP-1574B-M | Leak from packing |
| 29 May 2025 | Medium | PX_PP-1928-M | Replace lamp as per PM finding |
| 05 May 2025 | Medium | PX_PP-1574B-M | Megger test PP-1574B-M |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 30 Sept 2026 | 1,000 | 201000018540 | Corrective |