TERMINAL,LUG,FORK,2X4MM,CRIMP

Material 4200000384 · TERMINAL · Plant 1000

BReorderNormalBelow reorder point
Material
4200000384
Category
TERMINAL
Base unit
EA
MRP type
Stock Item
Criticality
B (1 of 3 FuncLocs A/B)
Supplier
LANGIT SEJAHTERA GLOBAL PT
Lead time
23 d · P80 35 d
Unit price
Rp 6,146

Recommendation

  • 1.Forecast 1,265 EA/year: 1,265 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~23 days; expected demand during lead time 80.
  • 3.A 99.7% service level gives the lowest holding + downtime-risk cost: reorder at 1,000, order up to 2,265.
  • 4.On hand 194 + on order 0 is at or below the reorder point: order 2,071 now.
  • 5.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Proposed purchase requisition
2,071 EA
Rp 12.7M · order by 01 Oct 2026
Expected arrival ≈ 23 days
Single source
On hand / on order
194 / 0
no open PO
Today Min / Max
32 / 101
static parameters in BoM
Rec. Min (reorder point)
1,000
safety stock 921
Rec. Max
2,265
order qty 1,265
Service level
99.7%
stockout risk now 8%
Unit price
Rp 6,146
PO history
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 1 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 62.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~9 days.

Installed on 3 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1928-M
MOTOR FOR PP-1928
B131.05
PX_PP-1574B-M
MOTOR FOR PP-1574B
C161.47
PX_JBX-1779
JUNCTION BOX
C100.01

Lead time and procurement

Lead time 23 ± 13 days (PO history + category, 1 PO lines) · on-time 71%

PR dateTypeQtyUnit priceDeliveryLead time
11 May 2026PR06
Regular replenishment
451Rp 6,14609 Jun 202629 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
12 Sept 2026HighPX_PP-1928-MMegger test PP-1928-M
22 Jul 2026LowPX_PP-1574B-MPP-1574B-M high temp
14 Mar 2026LowPX_PP-1574B-MInstall scaffolding at PP-1574B-M
08 Jan 2026MediumPX_PP-1574B-MInstall scaffolding at PP-1574B-M
11 Dec 2025MediumPX_PP-1574B-MPP-1574B-M bearing noise
16 Oct 2025HighPX_PP-1928-MPP-1928-M bearing noise
15 Sept 2025HighPX_PP-1574B-MLeak from packing
29 May 2025MediumPX_PP-1928-MReplace lamp as per PM finding
05 May 2025MediumPX_PP-1574B-MMegger test PP-1574B-M

Recent goods issues

Posting dateQtyOrderOrder type
30 Sept 20261,000201000018540Corrective