TERMINAL,LUG,PIN,2X6MM,CRIMP

Material 4200000424 · TERMINAL · Plant 1000

AMonitorSlow-moving
Material
4200000424
Category
TERMINAL
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 7 FuncLocs A/B)
Supplier
No PO history
Lead time
21 d · P80 35 d
Unit price
Rp 2,031 (est.)

Recommendation

  • 1.Forecast 13 EA/year: 13 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~21 days; expected demand during lead time 0.8.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 162, order up to 324.
  • 4.Installed on 7 FuncLoc(s), 2 of them criticality A/B.
Price estimatedLead time estimatedSame description as 1 other material number
On hand / on order
275 / 0
no open PO
Today Min / Max
192 / 286
static parameters in BoM
Rec. Min (reorder point)
162
safety stock 162
Rec. Max
324
order qty 162
Service level
100.0%
stockout risk now 0%
Unit price
Rp 2,031
Category + unit estimate
ML early warning: 11% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (1,000 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 16.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~9 days.

Installed on 7 functional locations

2 with criticality A/B · 9 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_JBX-321
JUNCTION BOX
A100.01
PX_PP-1770-M
MOTOR FOR PP-1770
B300.19
PX_PP-479-M
MOTOR FOR PP-479
C130.62
PX_KC-536A-M
MOTOR FOR KC-536A
C111.00
PX_JBX-1013
JUNCTION BOX
C100.01
PX_JBX-1779
JUNCTION BOX
C100.01
PX_PP-483B-CSS
CONTROL SWITCH STATION FOR PP-483B-M
C100.19

Lead time and procurement

Lead time 21 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
20 Jan 2026MediumPX_PP-479-MPainting PP-479-M
21 Nov 2025MediumPX_PP-479-MReplace lamp as per PM finding
02 Jun 2025MediumPX_KC-536A-MKC-536A-M bearing noise
22 May 2025LowPX_PP-479-MMegger test PP-479-M

Recent goods issues

Posting dateQtyOrderOrder type
21 Aug 20251,000203000020904Turnaround