Sparely
DU

TERMINAL,LUG,FORK,2X5MM,CRIMP

Material 4200000445 · TERMINAL · Plant 1000

AReorderCriticalStockout
Material
4200000445
Category
TERMINAL
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
21 d · P80 35 d
Unit price
Rp 2,031 (est.)

Recommendation

  • 1.Forecast 103 EA/year: 103 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~21 days; expected demand during lead time 6.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 200, order up to 400.
  • 4.On hand 0 + on order 0 is at or below the reorder point: order 400 now.
  • 5.Installed on 3 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
400 EA
Rp 812,400 · order by 01 Oct 2026
Expected arrival ≈ 21 days
Price estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
37 / 115
static parameters in BoM
Rec. Min (reorder point)
200
safety stock 195
Rec. Max
400
order qty 200
Service level
100.0%
stockout risk now 3%
Unit price
Rp 2,031
Category + unit estimate
ML early warning: 6% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 415 days ago, 2 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 100.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~9 days.

Installed on 3 functional locations

2 with criticality A/B · 4 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-392A-M
MOTOR FOR PP-392A
A131.05
PX_PP-1909A-M
MOTOR FOR PP-1909A
A200.19
PX_PP-744B-M
MOTOR FOR PP-744B
C120.19

Lead time and procurement

Lead time 21 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
23 Aug 2026EmergencyPX_PP-392A-MPP-392A-M high temp
06 Aug 2026LowPX_PP-744B-MPainting PP-744B-M
03 Jul 2026LowPX_PP-392A-M[MSI-B-26-GEW-387/M] Replace line
11 May 2025MediumPX_PP-744B-MPP-744B-M bearing noise
04 May 2025MediumPX_PP-392A-MPSM25/Replace lamp as per PM finding

Recent goods issues

Posting dateQtyOrderOrder type
12 Aug 2025200201000005686Corrective