Sparely
DU

TERMINAL,LUG,RING,8X5MM,CRIMP

Material 4200000484 · TERMINAL · Plant 1000

AReorderNormalSlow-moving
Material
4200000484
Category
TERMINAL
Base unit
EA
MRP type
Stock Item
Criticality
A (3 of 4 FuncLocs A/B)
Supplier
No PO history
Lead time
21 d · P80 35 d
Unit price
Rp 2,031 (est.)

Recommendation

  • 1.Forecast 149 EA/year: 149 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~21 days; expected demand during lead time 8.6.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 260, order up to 520.
  • 4.On hand 75 + on order 0 is at or below the reorder point: order 445 now.
  • 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
445 EA
Rp 903,795 · order by 01 Oct 2026
Expected arrival ≈ 21 days
Price estimatedLead time estimated
On hand / on order
75 / 0
no open PO
Today Min / Max
39 / 62
static parameters in BoM
Rec. Min (reorder point)
260
safety stock 252
Rec. Max
520
order qty 260
Service level
99.9%
stockout risk now 3%
Unit price
Rp 2,031
Category + unit estimate
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 299 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Lumpy · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 110.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~9 days.

Installed on 4 functional locations

3 with criticality A/B · 7 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1157-M
MOTOR FOR PP-1157
A220.19
PX_PP-1309A-M
MOTOR FOR PP-1309A
A100.19
PX_PP-1837A-CSS
CONTROL SWITCH STATION FOR PP-1837A-M
B300.19
PY_PP-1056-M
MOTOR FOR PP-1056
C100.19

Lead time and procurement

Lead time 21 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
27 Jul 2026MediumPX_PP-1157-MInstall scaffolding at PP-1157-M
21 May 2025MediumPX_PP-1157-MPSM25/Install cover plate for MCP cracki

Recent goods issues

Posting dateQtyOrderOrder type
06 Dec 2025500201000032585Corrective
23 Jul 202520201000001728Corrective