TERMINAL,LUG,RING,8X5MM,CRIMP
Material 4200000484 · TERMINAL · Plant 1000
AReorderNormalSlow-moving
- Material
- 4200000484
- Category
- TERMINAL
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (3 of 4 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 21 d · P80 35 d
- Unit price
- Rp 2,031 (est.)
Recommendation
- 1.Forecast 149 EA/year: 149 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~21 days; expected demand during lead time 8.6.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 260, order up to 520.
- 4.On hand 75 + on order 0 is at or below the reorder point: order 445 now.
- 5.Installed on 4 FuncLoc(s), 3 of them criticality A/B.
Proposed purchase requisition
445 EA
Rp 903,795 · order by 01 Oct 2026
Expected arrival ≈ 21 days
Price estimatedLead time estimated
On hand / on order
75 / 0
no open PO
Today Min / Max
39 / 62
static parameters in BoM
Rec. Min (reorder point)
260
safety stock 252
Rec. Max
520
order qty 260
Service level
99.9%
stockout risk now 3%
Unit price
Rp 2,031
Category + unit estimate
ML early warning: 13% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 299 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Lumpy · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 110.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~9 days.
Installed on 4 functional locations
3 with criticality A/B · 7 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1157-M MOTOR FOR PP-1157 | A | 2 | 2 | 0.19 |
| PX_PP-1309A-M MOTOR FOR PP-1309A | A | 1 | 0 | 0.19 |
| PX_PP-1837A-CSS CONTROL SWITCH STATION FOR PP-1837A-M | B | 3 | 0 | 0.19 |
| PY_PP-1056-M MOTOR FOR PP-1056 | C | 1 | 0 | 0.19 |
Lead time and procurement
Lead time 21 ± 13 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 27 Jul 2026 | Medium | PX_PP-1157-M | Install scaffolding at PP-1157-M |
| 21 May 2025 | Medium | PX_PP-1157-M | PSM25/Install cover plate for MCP cracki |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 06 Dec 2025 | 500 | 201000032585 | Corrective |
| 23 Jul 2025 | 20 | 201000001728 | Corrective |