TERMINAL,LUG,PIN,1.25X5MM,CRIMP
Material 4200000485 · TERMINAL · Plant 1000
AReorderNormalSlow-moving
- Material
- 4200000485
- Category
- TERMINAL
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (2 of 5 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 21 d · P80 35 d
- Unit price
- Rp 2,031 (est.)
Recommendation
- 1.Forecast 102 EA/year: 102 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~21 days; expected demand during lead time 5.9.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 135, order up to 270.
- 4.On hand 33 + on order 0 is at or below the reorder point: order 237 now.
- 5.Installed on 5 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
237 EA
Rp 481,347 · order by 01 Oct 2026
Expected arrival ≈ 21 days
Price estimatedLead time estimated
On hand / on order
33 / 0
no open PO
Today Min / Max
13 / 38
static parameters in BoM
Rec. Min (reorder point)
135
safety stock 130
Rec. Max
270
order qty 135
Service level
99.9%
stockout risk now 4%
Unit price
Rp 2,031
Category + unit estimate
ML early warning: 3% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 288 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 145.9M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~9 days.
Installed on 5 functional locations
2 with criticality A/B · 5 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-129D-M MOTOR FOR PP-129D | A | 1 | 0 | 0.19 |
| PY_2273-1644A-F19-B FLUSHING OIL LINE | B | 1 | 0 | 0.01 |
| PX_PP-500B-M MOTOR FOR PP-500B | C | 1 | 2 | 0.62 |
| PX_PP-1872B-M MOTOR FOR PP-1872B | C | 1 | 1 | 0.19 |
| PX_JBX-536 JUNCTION BOX | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 21 ± 13 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 05 Nov 2025 | Medium | PX_PP-500B-M | PP-500B-M bearing noise |
| 18 May 2025 | Medium | PX_PP-500B-M | PSM25/Replace lamp as per PM finding |
| 06 May 2025 | Low | PX_PP-1872B-M | Replace lamp as per PM finding |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 17 Dec 2025 | 200 | 201000034636 | Corrective |
| 17 Dec 2025 | 50 | 201000034636 | Corrective |
| 16 Dec 2025 | 20 | 201000034636 | Corrective |