TERMINAL,LUG,RING,1.25X3MM,CRIMP
Material 4200000533 · TERMINAL · Plant 1000
CReduceExcess
- Material
- 4200000533
- Category
- TERMINAL
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- C (0 of 3 FuncLocs A/B)
- Supplier
- RAJAWALI INDUSTRI ABADI PT
- Lead time
- 20 d · P80 35 d
- Unit price
- Rp 8,476
Recommendation
- 1.Forecast 76 EA/year: 76 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~20 days; expected demand during lead time 4.2.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 85, order up to 170.
- 4.Stock 699 exceeds the level to keep (170) by 529.
Convert to Stock ItemSingle source
On hand / on order
699 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
85
safety stock 81
Rec. Max
170
order qty 85
Service level
99.9%
stockout risk now 0%
Unit price
Rp 8,476
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 50 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 4.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~9 days.
Installed on 3 functional locations
0 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_JBX-1007A JUNCTION BOX | C | 1 | 0 | 0.01 |
| PX_JBX-131D JUNCTION BOX | C | 1 | 0 | 0.01 |
| PY_2769-4633A-F15-B EMPTY | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 20 ± 13 days (PO history + category, 2 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 23 Jan 2026 | PR10 Other | 35 | Rp 8,551 | 10 Feb 2026 | 18 d |
| 15 Nov 2025 | PR06 Regular replenishment | 46 | Rp 8,401 | 06 Dec 2025 | 21 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
No notifications on the equipment this part is installed on.
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 12 Aug 2026 | 100 | 201000020990 | Corrective |
| 21 Oct 2025 | 50 | 201000010832 | Corrective |
| 21 Oct 2025 | 20 | 201000010832 | Corrective |