TERMINAL,LUG,RING,1.25X3MM,CRIMP

Material 4200000533 · TERMINAL · Plant 1000

CReduceExcess
Material
4200000533
Category
TERMINAL
Base unit
EA
MRP type
Non Stock
Criticality
C (0 of 3 FuncLocs A/B)
Supplier
RAJAWALI INDUSTRI ABADI PT
Lead time
20 d · P80 35 d
Unit price
Rp 8,476

Recommendation

  • 1.Forecast 76 EA/year: 76 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~20 days; expected demand during lead time 4.2.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 85, order up to 170.
  • 4.Stock 699 exceeds the level to keep (170) by 529.
Convert to Stock ItemSingle source
On hand / on order
699 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
85
safety stock 81
Rec. Max
170
order qty 85
Service level
99.9%
stockout risk now 0%
Unit price
Rp 8,476
PO history
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 50 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~9 days.

Installed on 3 functional locations

0 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_JBX-1007A
JUNCTION BOX
C100.01
PX_JBX-131D
JUNCTION BOX
C100.01
PY_2769-4633A-F15-B
EMPTY
C100.01

Lead time and procurement

Lead time 20 ± 13 days (PO history + category, 2 PO lines) · on-time 39%

PR dateTypeQtyUnit priceDeliveryLead time
23 Jan 2026PR10
Other
35Rp 8,55110 Feb 202618 d
15 Nov 2025PR06
Regular replenishment
46Rp 8,40106 Dec 202521 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
12 Aug 2026100201000020990Corrective
21 Oct 202550201000010832Corrective
21 Oct 202520201000010832Corrective