TERMINAL,LUG,FORK,1.25X6MM,CRIMP
Material 4200000566 · TERMINAL · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4200000566
- Category
- TERMINAL
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (4 of 6 FuncLocs A/B)
- Supplier
- TIRTA SUPLINDO NUSANTARA PT
- Lead time
- 20 d · P80 35 d
- Unit price
- Rp 1,537
Recommendation
- 1.Forecast 325 EA/year: 325 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~20 days; expected demand during lead time 18.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 520, order up to 846.
- 4.On hand 512 + on order 0 is at or below the reorder point: order 334 now.
- 5.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
- 6.ML early warning: 59% probability of demand in the next 90 days.
Proposed purchase requisition
334 EA
Rp 513,191 · order by 01 Oct 2026
Expected arrival ≈ 20 days
ML early warningSingle source
On hand / on order
512 / 0
no open PO
Today Min / Max
407 / 620
static parameters in BoM
Rec. Min (reorder point)
520
safety stock 503
Rec. Max
846
order qty 326
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1,537
PO history
ML early warning: 59% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 72 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Lumpy · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 242.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~9 days.
Installed on 6 functional locations
4 with criticality A/B · 6 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-818-M MOTOR FOR PP-818 | A | 1 | 4 | 1.05 |
| PX_PP-1834B-M MOTOR FOR PP-1834B | A | 1 | 0 | 0.19 |
| PX_PP-536-M MOTOR FOR PP-536 | A | 1 | 0 | 0.19 |
| PX_PP-1765B-M MOTOR FOR PP-1765B | B | 1 | 0 | 0.19 |
| PY_5204-2125A-F27 MARSHALLING TERMINAL | C | 1 | 0 | 0.01 |
| PY_6868-7907B-F11-A SPARE SLOT | C | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 20 ± 13 days (PO history + category, 2 PO lines) · on-time 42%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 14 Apr 2026 | PR03 Regular replenishment | 201 | Rp 1,527 | 09 May 2026 | 25 d |
| 13 Apr 2026 | PR03 Regular replenishment | 397 | Rp 1,546 | 25 Apr 2026 | 12 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 09 Apr 2026 | Medium | PX_PP-818-M | Install scaffolding at PP-818-M |
| 19 Mar 2026 | Medium | PX_PP-818-M | Leak from packing |
| 25 Sept 2025 | Medium | PX_PP-818-M | PP-818-M bearing noise |
| 23 May 2025 | Low | PX_PP-818-M | PP-818-M high temp |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 21 Jul 2026 | 20 | 201000026702 | Corrective |
| 30 Dec 2025 | 500 | 201000015088 | Corrective |