Sparely
DU

TERMINAL,LUG,FORK,1.25X6MM,CRIMP

Material 4200000566 · TERMINAL · Plant 1000

AReorderNormalBelow reorder point
Material
4200000566
Category
TERMINAL
Base unit
EA
MRP type
Stock Item
Criticality
A (4 of 6 FuncLocs A/B)
Supplier
TIRTA SUPLINDO NUSANTARA PT
Lead time
20 d · P80 35 d
Unit price
Rp 1,537

Recommendation

  • 1.Forecast 325 EA/year: 325 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~20 days; expected demand during lead time 18.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 520, order up to 846.
  • 4.On hand 512 + on order 0 is at or below the reorder point: order 334 now.
  • 5.Installed on 6 FuncLoc(s), 4 of them criticality A/B.
  • 6.ML early warning: 59% probability of demand in the next 90 days.
Proposed purchase requisition
334 EA
Rp 513,191 · order by 01 Oct 2026
Expected arrival ≈ 20 days
ML early warningSingle source
On hand / on order
512 / 0
no open PO
Today Min / Max
407 / 620
static parameters in BoM
Rec. Min (reorder point)
520
safety stock 503
Rec. Max
846
order qty 326
Service level
100.0%
stockout risk now 0%
Unit price
Rp 1,537
PO history
ML early warning: 59% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 72 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Lumpy · 2 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 242.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~9 days.

Installed on 6 functional locations

4 with criticality A/B · 6 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-818-M
MOTOR FOR PP-818
A141.05
PX_PP-1834B-M
MOTOR FOR PP-1834B
A100.19
PX_PP-536-M
MOTOR FOR PP-536
A100.19
PX_PP-1765B-M
MOTOR FOR PP-1765B
B100.19
PY_5204-2125A-F27
MARSHALLING TERMINAL
C100.01
PY_6868-7907B-F11-A
SPARE SLOT
C100.01

Lead time and procurement

Lead time 20 ± 13 days (PO history + category, 2 PO lines) · on-time 42%

PR dateTypeQtyUnit priceDeliveryLead time
14 Apr 2026PR03
Regular replenishment
201Rp 1,52709 May 202625 d
13 Apr 2026PR03
Regular replenishment
397Rp 1,54625 Apr 202612 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
09 Apr 2026MediumPX_PP-818-MInstall scaffolding at PP-818-M
19 Mar 2026MediumPX_PP-818-MLeak from packing
25 Sept 2025MediumPX_PP-818-MPP-818-M bearing noise
23 May 2025LowPX_PP-818-MPP-818-M high temp

Recent goods issues

Posting dateQtyOrderOrder type
21 Jul 202620201000026702Corrective
30 Dec 2025500201000015088Corrective