Sparely
DU

TERMINAL,LUG,RING,1.25X6MM,CRIMP

Material 4200000689 · TERMINAL · Plant 1000

AReduceSlow-moving
Material
4200000689
Category
TERMINAL
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 2 FuncLocs A/B)
Supplier
ANUGRAH SEJAHTERA GLOBAL PT
Lead time
19 d · P80 35 d
Unit price
Rp 1,464

Recommendation

  • 1.Forecast 2.5 EA/year: 2.5 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~19 days; expected demand during lead time 0.1.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 162.
  • 4.Stock 1,910 exceeds the level to keep (1,640) by 270; the level includes the 1,640 used in the last turnaround.
  • 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Last turnaround used 1,640Single source
On hand / on order
1,910 / 0
no open PO
Today Min / Max
296 / 786
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
162
order qty 162
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1,464
PO history
ML early warning: 17% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (1,640 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 3.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~9 days.

Installed on 2 functional locations

1 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1945D-M
MOTOR FOR PP-1945D
A100.19
PX_PP-1021-M
MOTOR FOR PP-1021
C220.19

Lead time and procurement

Lead time 19 ± 13 days (PO history + category, 1 PO lines) · on-time 0%

PR dateTypeQtyUnit priceDeliveryLead time
16 Sept 2026PR06
Regular replenishment
556Rp 1,46430 Sept 202614 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
06 Feb 2026MediumPX_PP-1021-MInstall scaffolding at PP-1021-M
21 May 2025MediumPX_PP-1021-MMegger test PP-1021-M

Recent goods issues

Posting dateQtyOrderOrder type
09 Jan 20261,000203000006950Turnaround
09 Jan 202620203000006950Turnaround
09 Jan 2026100203000006950Turnaround
08 Jan 202620203000006950Turnaround
07 Jan 2026500203000006950Turnaround