TERMINAL,LUG,RING,1.25X6MM,CRIMP
Material 4200000689 · TERMINAL · Plant 1000
AReduceSlow-moving
- Material
- 4200000689
- Category
- TERMINAL
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (1 of 2 FuncLocs A/B)
- Supplier
- ANUGRAH SEJAHTERA GLOBAL PT
- Lead time
- 19 d · P80 35 d
- Unit price
- Rp 1,464
Recommendation
- 1.Forecast 2.5 EA/year: 2.5 unplanned (installed-base failure prior (no history)).
- 2.Lead time ~19 days; expected demand during lead time 0.1.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 162.
- 4.Stock 1,910 exceeds the level to keep (1,640) by 270; the level includes the 1,640 used in the last turnaround.
- 5.Installed on 2 FuncLoc(s), 1 of them criticality A/B.
Last turnaround used 1,640Single source
On hand / on order
1,910 / 0
no open PO
Today Min / Max
296 / 786
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
162
order qty 162
Service level
99.9%
stockout risk now 0%
Unit price
Rp 1,464
PO history
ML early warning: 17% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 1 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (1,640 units) excluded from the baseline.
Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 3.0M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~9 days.
Installed on 2 functional locations
1 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1945D-M MOTOR FOR PP-1945D | A | 1 | 0 | 0.19 |
| PX_PP-1021-M MOTOR FOR PP-1021 | C | 2 | 2 | 0.19 |
Lead time and procurement
Lead time 19 ± 13 days (PO history + category, 1 PO lines) · on-time 0%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 16 Sept 2026 | PR06 Regular replenishment | 556 | Rp 1,464 | 30 Sept 2026 | 14 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 06 Feb 2026 | Medium | PX_PP-1021-M | Install scaffolding at PP-1021-M |
| 21 May 2025 | Medium | PX_PP-1021-M | Megger test PP-1021-M |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 09 Jan 2026 | 1,000 | 203000006950 | Turnaround |
| 09 Jan 2026 | 20 | 203000006950 | Turnaround |
| 09 Jan 2026 | 100 | 203000006950 | Turnaround |
| 08 Jan 2026 | 20 | 203000006950 | Turnaround |
| 07 Jan 2026 | 500 | 203000006950 | Turnaround |