TERMINAL,LUG,FORK,5.5X6MM,CRIMP
Material 4200000780 · TERMINAL · Plant 1000
CReorderHighStockout
- Material
- 4200000780
- Category
- TERMINAL
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- C (0 of 5 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 21 d · P80 35 d
- Unit price
- Rp 2,031 (est.)
Recommendation
- 1.Forecast 2,535 EA/year: 2,535 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~21 days; expected demand during lead time 146.
- 3.A 94.4% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 2,536.
- 4.On hand 0 + on order 0 is at or below the reorder point: order 2,536 now.
- 5.ML early warning: 56% probability of demand in the next 90 days.
Proposed purchase requisition
2,536 EA
Rp 5.2M · order by 01 Oct 2026
Expected arrival ≈ 21 days
ML early warningPrice estimatedLead time estimated
On hand / on order
0 / 0
no open PO
Today Min / Max
328 / 547
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
2,536
order qty 2,536
Service level
94.4%
stockout risk now 6%
Unit price
Rp 2,031
Category + unit estimate
ML early warning: 56% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 95 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Lumpy · 2 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 5.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~9 days.
Installed on 5 functional locations
0 with criticality A/B · 9 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-423A-M MOTOR FOR PP-423A | C | 2 | 1 | 0.19 |
| PX_JBX-1310A JUNCTION BOX (EXP) | C | 1 | 0 | 0.01 |
| PX_JBX-333 JUNCTION BOX | C | 1 | 0 | 0.01 |
| PX_PP-1938A-M MOTOR FOR PP-1938A | C | 1 | 0 | 0.19 |
| PX_PP-942D-M MOTOR FOR PP-942D | C | 4 | 0 | 0.19 |
Lead time and procurement
Lead time 21 ± 13 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 04 Jun 2025 | Medium | PX_PP-423A-M | Install scaffolding at PP-423A-M |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 28 Jun 2026 | 50 | 201000032450 | Corrective |
| 26 Jan 2026 | 5,000 | 204000016196 | Preventive |