Sparely
DU

TERMINAL,LUG,FORK,2X3MM,CRIMP

Material 4200000833 · TERMINAL · Plant 1000

CMonitorSlow-moving
Material
4200000833
Category
TERMINAL
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 3 FuncLocs A/B)
Supplier
No PO history
Lead time
21 d · P80 35 d
Unit price
Rp 2,031 (est.)

Recommendation

  • 1.Forecast 11 EA/year: 11 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~21 days; expected demand during lead time 0.6.
  • 3.A 98.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 50.
Price estimatedLead time estimated
On hand / on order
11 / 0
no open PO
Today Min / Max
9 / 13
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
50
order qty 50
Service level
98.8%
stockout risk now 1%
Unit price
Rp 2,031
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 439 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~9 days.

Installed on 3 functional locations

0 with criticality A/B · 3 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_JBX-1281
JUNCTION BOX (EXP)
C110.01
PX_PP-1706A-M
MOTOR FOR PP-1706A
C110.19
PX_PP-246C-CSS
CONTROL SWITCH STATION FOR PP-246C-M
C100.19

Lead time and procurement

Lead time 21 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 May 2025MediumPX_JBX-1281Leak from packing
20 May 2025LowPX_PP-1706A-MPP-1706A-M bearing noise

Recent goods issues

Posting dateQtyOrderOrder type
19 Jul 202550201000036638Corrective