TERMINAL,LUG,FORK,1.25X3MM,CRIMP
Material 4200000926 · TERMINAL · Plant 1000
BMonitorSlow-moving
- Material
- 4200000926
- Category
- TERMINAL
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- B (1 of 3 FuncLocs A/B)
- Supplier
- RAJAWALI INDUSTRI ABADI PT
- Lead time
- 32 d · P80 35 d
- Unit price
- Rp 9,393
Recommendation
- 1.Forecast 415 EA/year: 415 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~32 days; expected demand during lead time 37.
- 3.A 96.4% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 1,000.
- 4.Installed on 3 FuncLoc(s), 1 of them criticality A/B.
Single sourceSame description as 1 other material number
On hand / on order
121 / 0
no open PO
Today Min / Max
81 / 197
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
1,000
order qty 1,000
Service level
96.4%
stockout risk now 4%
Unit price
Rp 9,393
PO history
ML early warning: 27% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 371 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 20.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.53% for ~9 days.
Installed on 3 functional locations
1 with criticality A/B · 3 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1716-M MOTOR FOR PP-1716 | B | 1 | 0 | 0.19 |
| PX_PP-1107B-CSS CONTROL SWITCH STATION FOR PP-1107B-M | C | 1 | 2 | 0.62 |
| PX_PP-1701B-CSS CONTROL SWITCH STATION FOR PP-1701B-M | C | 1 | 1 | 0.19 |
Lead time and procurement
Lead time 32 ± 13 days (PO history + category, 2 PO lines) · on-time 39%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 24 Jun 2026 | PR01 Import / long-lead | 337 | Rp 9,695 | 01 Sept 2026 | 69 d |
| 10 Jun 2026 | PR03 Regular replenishment | 300 | Rp 9,090 | 10 Jul 2026 | 30 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 08 Dec 2025 | Low | PX_PP-1107B-CSS | Install scaffolding at PP-1107B-CSS |
| 25 Jul 2025 | Medium | PX_PP-1107B-CSS | Replace lamp as per PM finding |
| 14 May 2025 | Medium | PX_PP-1701B-CSS | Install scaffolding at PP-1701B-CSS |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 25 Sept 2025 | 1,000 | 201000007115 | Corrective |