Sparely
DU

TERMINAL,LUG,RING,1.25X5MM,CRIMP

Material 4200000931 · TERMINAL · Plant 1000

AReorderNormalSlow-moving
Material
4200000931
Category
TERMINAL
Base unit
EA
MRP type
Stock Item
Criticality
A (2 of 2 FuncLocs A/B)
Supplier
No PO history
Lead time
21 d · P80 35 d
Unit price
Rp 2,031 (est.)

Recommendation

  • 1.Forecast 139 EA/year: 139 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~21 days; expected demand during lead time 8.0.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 500, order up to 1,000.
  • 4.On hand 293 + on order 0 is at or below the reorder point: order 707 now.
  • 5.Installed on 2 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
707 EA
Rp 1.4M · order by 01 Oct 2026
Expected arrival ≈ 21 days
Price estimatedLead time estimated
On hand / on order
293 / 0
no open PO
Today Min / Max
78 / 246
static parameters in BoM
Rec. Min (reorder point)
500
safety stock 493
Rec. Max
1,000
order qty 500
Service level
100.0%
stockout risk now 2%
Unit price
Rp 2,031
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 303 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 53.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~9 days.

Installed on 2 functional locations

2 with criticality A/B · 2 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-695B-CSS
CONTROL SWITCH STATION FOR PP-695B-M
A100.19
PX_PP-248B-M
MOTOR FOR PP-248B
B100.19

Lead time and procurement

Lead time 21 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
02 Dec 2025500201000032890Corrective