Sparely
DU

TERMINAL,LUG,FORK,8X5MM,CRIMP

Material 4200001065 · TERMINAL · Plant 1000

CMonitorPotentially obsolete
Material
4200001065
Category
TERMINAL
Base unit
EA
MRP type
Stock Item
Criticality
C (0 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
21 d · P80 35 d
Unit price
Rp 2,031 (est.)

Recommendation

  • 1.Forecast 6.6 EA/year: 6.6 unplanned (installed-base failure prior (no history)).
  • 2.Lead time ~21 days; expected demand during lead time 0.4.
  • 3.A 99.8% service level gives the lowest holding + downtime-risk cost: reorder at 0, order up to 162.
Price estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
0
safety stock 0
Rec. Max
162
order qty 162
Service level
99.8%
stockout risk now 0%
Unit price
Rp 2,031
Category + unit estimate
ML early warning: 1% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue never, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern No demand · 0 issue days · method: Installed-base failure prior (no history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 208,001/yr in expected downtime and emergency buys. A stockout here stops production with probability 0.16% for ~9 days.

Installed on 1 functional locations

0 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_KC-379A-M
MOTOR FOR KC-379A
C111.00

Lead time and procurement

Lead time 21 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
30 Jun 2025HighPX_KC-379A-MMegger test KC-379A-M

Recent goods issues

Never issued in the 17-month history.