Sparely
DU

TERMINAL,LUG,FORK,1.25X3MM,CRIMP

Material 4200001298 · TERMINAL · Plant 1000

AReduceSlow-moving
Material
4200001298
Category
TERMINAL
Base unit
EA
MRP type
Stock Item
Criticality
A (1 of 1 FuncLocs A/B)
Supplier
No PO history
Lead time
21 d · P80 35 d
Unit price
Rp 2,031 (est.)

Recommendation

  • 1.Forecast 4.8 EA/year: 4.8 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~21 days; expected demand during lead time 0.3.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 50, order up to 100.
  • 4.Stock 453 exceeds the level to keep (450) by 3; the level includes the 450 used in the last turnaround.
  • 5.Installed on 1 FuncLoc(s), 1 of them criticality A/B.
Last turnaround used 450Price estimatedLead time estimatedSame description as 1 other material number
On hand / on order
453 / 0
no open PO
Today Min / Max
100 / 220
static parameters in BoM
Rec. Min (reorder point)
50
safety stock 50
Rec. Max
100
order qty 50
Service level
100.0%
stockout risk now 0%
Unit price
Rp 2,031
Category + unit estimate
ML early warning: 4% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 458 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (450 units) excluded from the baseline.

Demand pattern Single issue · 1 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 18.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~9 days.

Installed on 1 functional locations

1 with criticality A/B · 1 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_JBX-1363
JUNCTION BOX
A100.01

Lead time and procurement

Lead time 21 ± 13 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

No notifications on the equipment this part is installed on.

Recent goods issues

Posting dateQtyOrderOrder type
31 Jan 2026200203000033471Turnaround
31 Jan 202650203000033471Turnaround
27 Jan 2026200203000033471Turnaround
30 Jun 202550205000015480Other maintenance