Sparely
DU

GLAND,CABLE,SIZE HZ226,NBR

Material 4200001341 · GLAND · Plant 1000

AMaintainHealthy
Material
4200001341
Category
GLAND
Base unit
EA
MRP type
Stock Item
Criticality
A (39 of 82 FuncLocs A/B)
Supplier
CAHAYA UTAMA GLOBAL PT
Lead time
43 d · P80 63 d
Unit price
Rp 355,577

Recommendation

  • 1.Forecast 16 EA/year: 16 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~43 days; expected demand during lead time 1.9.
  • 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 8, order up to 25.
  • 4.Installed on 82 FuncLoc(s), 39 of them criticality A/B.
  • 5.ML early warning: 88% probability of demand in the next 90 days.
ML early warningLast turnaround used 6Single source
On hand / on order
20 / 0
no open PO
Today Min / Max
5 / 12
static parameters in BoM
Rec. Min (reorder point)
8
safety stock 7
Rec. Max
25
order qty 17
Service level
99.9%
stockout risk now 0%
Unit price
Rp 355,577
PO history
ML early warning: 88% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 5 issue days in the last 180 days, last issue 44 days ago, 4 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (6 units) excluded from the baseline.

Demand pattern Intermittent · 20 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 4.4B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~16 days.

Installed on 82 functional locations

39 with criticality A/B · 110 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PIT-1063-22B
PRESSURE
A140.90
PY_LIT-485
LEVEL
A141.75
PX_PP-606D-M
MOTOR FOR PP-606D
A131.05
UT_JBX-691
JUNCTION BOX
A120.01
PX_FIT-729
FLOW
A110.47
PX_FIT-1560A
SLOP OIL FLOW
A100.04
PX_FIT-643C
FLOW
A100.04
PX_LIT-1788A-20
VD-899 LEVEL
A300.03
PX_LIT-799C
LEVEL
A100.03
PX_LIT-805
LEVEL
A100.03
PX_PIT-1005
RICH AMINE PRESSURE
A300.04
PX_PIT-1377A
C4 PRODUCT PRESSURE
A100.04

Lead time and procurement

Lead time 43 ± 21 days (PO history, 11 PO lines) · on-time 55%

PR dateTypeQtyUnit priceDeliveryLead time
05 Aug 2026PR03
Regular replenishment
11Rp 362,87423 Aug 202618 d
19 Jun 2026PR03
Regular replenishment
15Rp 355,09814 Jul 202625 d
03 Jun 2026PR06
Regular replenishment
10Rp 354,50304 Aug 202662 d
02 Mar 2026PR03
Regular replenishment
5Rp 362,04525 Mar 202623 d
08 Nov 2025PR06
Regular replenishment
6Rp 355,57704 Jan 202657 d
05 Nov 2025PR06
Regular replenishment
7Rp 365,50819 Jan 202675 d
21 Oct 2025PR03
Regular replenishment
13Rp 351,08022 Dec 202562 d
28 Aug 2025PR06
Regular replenishment
11Rp 347,50905 Nov 202569 d
08 Aug 2025PR03
Regular replenishment
9Rp 360,21721 Aug 202513 d
13 Jul 2025PR03
Regular replenishment
8Rp 362,78514 Sept 202563 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
04 Sept 2026MediumPX_TEL-389-47AInstall scaffolding at TEL-389-47A
02 Sept 2026LowPX_PP-103-MPP-103-M bearing noise
12 Aug 2026MediumPY_LIT-485Replace lamp as per PM finding
16 Jul 2026MediumPX_PP-606D-MLeak from packing
14 Jul 2026MediumPX_FIT-383AFIT-383A reading frozen
05 May 2026MediumPY_LIT-485AR25/tranmsitter low performance
14 Apr 2026LowPX_PIT-1063-22BPainting PIT-1063-22B
02 Apr 2026MediumPX_PIT-1063-22BAR25/tranmsitter low performance
16 Mar 2026MediumPX_PP-606D-MPP-606D-M high temp
06 Feb 2026MediumPX_PP-1021-MInstall scaffolding at PP-1021-M

Recent goods issues

Posting dateQtyOrderOrder type
18 Aug 20262201000021082Corrective
25 Jun 20262201000031485Corrective
24 Jun 20261201000031485Corrective
25 May 20262201000019630Corrective
14 May 20261201000026145Corrective
30 Mar 20261201000001342Corrective
23 Feb 20261201000036183Corrective
28 Jan 20262201000013350Corrective
25 Jan 20261201000021406Corrective
24 Jan 20261201000019717Corrective
15 Jan 20261201000010319Corrective
14 Jan 20261201000010319Corrective
05 Jan 20261203000006950Turnaround
05 Jan 20262203000006950Turnaround
04 Jan 20261203000006950Turnaround