GLAND,CABLE,SIZE EU534,INCOLOY
Material 4200001367 · GLAND · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4200001367
- Category
- GLAND
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (10 of 25 FuncLocs A/B)
- Supplier
- SURYA LOGAM LESTARI PT
- Lead time
- 31 d · P80 38 d
- Unit price
- Rp 130,810
Recommendation
- 1.Forecast 6.4 EA/year: 6.4 unplanned (recency-weighted compound poisson (own history)).
- 2.Lead time ~31 days; expected demand during lead time 0.5.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 12.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 10 now.
- 5.Installed on 25 FuncLoc(s), 10 of them criticality A/B.
- 6.ML early warning: 74% probability of demand in the next 90 days.
Proposed purchase requisition
10 EA
Rp 1.3M · order by 01 Oct 2026
Expected arrival ≈ 31 days
ML early warningLast turnaround used 2Single source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
12
order qty 7
Service level
99.9%
stockout risk now 5%
Unit price
Rp 130,810
PO history
ML early warning: 74% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 179 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 3 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (2 units) excluded from the baseline.
Demand pattern Intermittent · 9 issue days · method: Recency-weighted compound Poisson (own history).
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 1.5B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~16 days.
Installed on 25 functional locations
10 with criticality A/B · 27 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1984A-M MOTOR FOR PP-1984A | A | 1 | 4 | 1.05 |
| PX_PP-1121-M MOTOR FOR PP-1121 | A | 1 | 2 | 1.05 |
| PX_JBX-1109 JUNCTION BOX | A | 1 | 0 | 0.01 |
| PX_PP-1177C-M MOTOR FOR PP-1177C | A | 1 | 0 | 0.19 |
| PX_PP-160D-M MOTOR FOR PP-160D | A | 1 | 0 | 0.19 |
| PX_PP-412-M MOTOR FOR PP-412 | A | 1 | 0 | 0.19 |
| PX_PP-1271-M MOTOR FOR PP-1271 | B | 1 | 2 | 0.62 |
| PX_PP-1782A-M MOTOR FOR PP-1782A | B | 1 | 1 | 0.19 |
| PX_PP-1024-M MOTOR FOR PP-1024 | B | 1 | 0 | 0.19 |
| PX_PP-828B-M MOTOR FOR PP-828B | B | 1 | 0 | 0.19 |
| PX_FIT-525B CONDENSATE FLOW | C | 1 | 2 | 0.47 |
| PX_TEL-374 CRACKED GAS OUTLET BF-102 | C | 1 | 1 | 0.01 |
Lead time and procurement
Lead time 31 ± 13 days (PO history, 7 PO lines) · on-time 20%
| PR date | Type | Qty | Unit price | Delivery | Lead time |
|---|---|---|---|---|---|
| 07 Jul 2026 | PR03 Regular replenishment | 6 | Rp 130,810 | 29 Aug 2026 | 53 d |
| 07 Jul 2026 | PR03 Regular replenishment | 6 | Rp 130,263 | 27 Jul 2026 | 20 d |
| 08 Apr 2026 | PR03 Regular replenishment | 3 | Rp 137,121 | 18 May 2026 | 40 d |
| 10 Nov 2025 | PR06 Regular replenishment | 6 | Rp 137,563 | 06 Dec 2025 | 26 d |
| 01 Nov 2025 | PR03 Regular replenishment | 7 | Rp 130,560 | 02 Dec 2025 | 31 d |
| 17 Jul 2025 | PR03 Regular replenishment | 6 | Rp 136,247 | 14 Aug 2025 | 28 d |
| 17 Jun 2025 | PR03 Regular replenishment | 7 | Rp 128,539 | 12 Jul 2025 | 25 d |
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 01 Jul 2026 | Medium | PX_PP-1984A-M | Install scaffolding at PP-1984A-M |
| 22 Apr 2026 | Low | PX_PP-1984A-M | Replace lamp as per PM finding |
| 11 Mar 2026 | Emergency | PX_TEL-806B | Leak from packing |
| 11 Dec 2025 | High | PX_PP-1271-M | Megger test PP-1271-M |
| 22 Nov 2025 | High | PX_PP-1121-M | Replace lamp as per PM finding |
| 23 Sept 2025 | Medium | PX_PP-1984A-M | [MSI-B-25-DDT-125] Permanent repair |
| 05 Aug 2025 | Low | PX_FIT-525B | Leak from packing |
| 25 Jul 2025 | Medium | PX_PP-1121-M | Megger test PP-1121-M |
| 06 Jul 2025 | Medium | PX_TEL-806B | Inspection TEL-806B.ok |
| 28 May 2025 | Low | PX_PP-1271-M | PP-1271-M bearing noise |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 05 Apr 2026 | 3 | 205000024842 | Other maintenance |
| 05 Feb 2026 | 2 | 201000018578 | Corrective |
| 27 Jan 2026 | 1 | 201000035370 | Corrective |
| 08 Jan 2026 | 1 | 201000019913 | Corrective |
| 30 Dec 2025 | 1 | 201000036306 | Corrective |
| 10 Dec 2025 | 1 | 201000018729 | Corrective |
| 07 Dec 2025 | 1 | 203000014228 | Turnaround |
| 03 Dec 2025 | 1 | 203000014228 | Turnaround |
| 23 Nov 2025 | 1 | 201000039660 | Corrective |
| 31 Jul 2025 | 2 | 201000023881 | Corrective |
| 07 Jul 2025 | 1 | 201000018841 | Corrective |