GLAND,CABLE,SIZE YL811,CS

Material 4200001385 · GLAND · Plant 1000

AReorderNormalBelow reorder point
Material
4200001385
Category
GLAND
Base unit
EA
MRP type
Stock Item
Criticality
A (11 of 22 FuncLocs A/B)
Supplier
PRIMA LOGAM SENTOSA PT
Lead time
26 d · P80 25 d
Unit price
Rp 127,079

Recommendation

  • 1.Forecast 4.3 EA/year: 4.3 unplanned (recency-weighted compound poisson (own history)).
  • 2.Lead time ~26 days; expected demand during lead time 0.3.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 4, order up to 9.
  • 4.On hand 2 + on order 0 is at or below the reorder point: order 7 now.
  • 5.Installed on 22 FuncLoc(s), 11 of them criticality A/B.
  • 6.ML early warning: 55% probability of demand in the next 90 days.
Proposed purchase requisition
7 EA
Rp 889,553 · order by 01 Oct 2026
Expected arrival ≈ 26 days
ML early warningSingle source
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 3
static parameters in BoM
Rec. Min (reorder point)
4
safety stock 4
Rec. Max
9
order qty 5
Service level
100.0%
stockout risk now 2%
Unit price
Rp 127,079
PO history
ML early warning: 55% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 101 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Lumpy · 6 issue days · method: Recency-weighted compound Poisson (own history).

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 1.1B/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~16 days.

Installed on 22 functional locations

11 with criticality A/B · 28 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-217-M
MOTOR FOR PP-217
A151.90
PX_PP-166A-M
MOTOR FOR PP-166A
A110.19
PX_PP-697A-M
MOTOR FOR PP-697A
A110.62
PX_JBX-1363
JUNCTION BOX
A400.01
PX_PP-1309A-M
MOTOR FOR PP-1309A
A100.19
PX_PP-1323B-M
MOTOR FOR PP-1323B
A100.19
PX_PP-506A-M
MOTOR FOR PP-506A
A100.19
PX_PP-1782B-M
MOTOR FOR PP-1782B
B110.19
PX_KC-575B-M
MOTOR FOR KC-575B
B300.57
PX_PP-1024-M
MOTOR FOR PP-1024
B100.19
PX_PP-1886B-M
MOTOR FOR PP-1886B
B100.19
PX_PP-408B-M
MOTOR FOR PP-408B
C121.05

Lead time and procurement

Lead time 26 ± 9 days (PO history, 3 PO lines) · on-time 44%

PR dateTypeQtyUnit priceDeliveryLead time
30 May 2026PR03
Regular replenishment
2Rp 127,07922 Jun 202623 d
20 Apr 2026PR03
Regular replenishment
3Rp 126,29010 May 202620 d
18 May 2025PR03
Regular replenishment
4Rp 128,16313 Jun 202526 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
08 Jun 2026MediumPX_PP-408B-MMegger test PP-408B-M
07 Apr 2026MediumPX_PP-1967A-MInstall scaffolding at PP-1967A-M
23 Dec 2025MediumPX_PP-217-MMegger test PP-217-M
08 Nov 2025MediumPX_PP-217-MReplace lamp as per PM finding
15 Sept 2025MediumPX_PP-217-MPP-217-M high temp
05 Sept 2025HighPX_PP-217-MInstall scaffolding at PP-217-M
28 Jul 2025MediumPX_PP-408B-MLeak from packing
16 Jul 2025MediumPX_PP-697A-MPP-697A-M high temp
15 Jun 2025LowPX_PP-217-MReplace lamp as per PM finding
30 May 2025MediumPX_PP-166A-MPP-166A-M high temp

Recent goods issues

Posting dateQtyOrderOrder type
22 Jun 20261201000023783Corrective
13 Jan 20263206000020289Other maintenance
12 Jan 20261206000020289Other maintenance
01 Dec 20251201000036688Corrective
31 Aug 20251201000025653Corrective
28 Jul 20251201000024339Corrective