GLAND,CABLE,MODEL PI295,VITON
Material 4200001389 · GLAND · Plant 1000
AReorderNormalSlow-moving
- Material
- 4200001389
- Category
- GLAND
- Base unit
- EA
- MRP type
- Stock Item
- Criticality
- A (12 of 25 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 52 d
- Unit price
- Rp 183,915 (est.)
Recommendation
- 1.Forecast 2.4 EA/year: 2.4 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~29 days; expected demand during lead time 0.2.
- 3.A 99.9% service level gives the lowest holding + downtime-risk cost: reorder at 3, order up to 6.
- 4.On hand 2 + on order 0 is at or below the reorder point: order 4 now.
- 5.Installed on 25 FuncLoc(s), 12 of them criticality A/B.
- 6.ML early warning: 39% probability of demand in the next 90 days.
Proposed purchase requisition
4 EA
Rp 735,660 · order by 01 Oct 2026
Expected arrival ≈ 29 days
ML early warningPrice estimatedLead time estimated
On hand / on order
2 / 0
no open PO
Today Min / Max
1 / 2
static parameters in BoM
Rec. Min (reorder point)
3
safety stock 3
Rec. Max
6
order qty 3
Service level
99.9%
stockout risk now 1%
Unit price
Rp 183,915
Category + unit estimate
ML early warning: 39% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 0 issue days in the last 180 days, last issue 278 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 690.6M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~16 days.
Installed on 25 functional locations
12 with criticality A/B · 28 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_FIT-278 FLOW | A | 1 | 1 | 0.47 |
| PX_TIT-556A TEMPERATURE | A | 1 | 1 | 0.47 |
| PX_JBX-1777A JUNCTION BOX | A | 1 | 0 | 0.01 |
| PX_PIT-1377 COOLING WATER PRESSURE | A | 1 | 0 | 0.04 |
| PX_TIT-790C-10A TEMPERATURE | A | 1 | 0 | 0.04 |
| PY_PP-1139B-M MOTOR FOR PP-1139B | B | 1 | 1 | 0.19 |
| PX_JBX-1547C JUNCTION BOX (EXP) | B | 1 | 0 | 0.01 |
| PX_PP-1540-M MOTOR FOR PP-1540 | B | 1 | 0 | 0.19 |
| PX_PP-1991A-M MOTOR FOR PP-1991A | B | 1 | 0 | 0.19 |
| PX_PP-795D-M MOTOR FOR PP-795D | B | 1 | 0 | 0.19 |
| PX_TEL-117C-4 TEMPERATURE | B | 1 | 0 | 0.01 |
| PX_TEL-1364 KC-391D BTM | B | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 29 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 05 Sept 2026 | Medium | PX_JBX-1039C | [MSI-B-26-RWD-296] Permanent repair |
| 19 Dec 2025 | Medium | PX_JBX-1039C | Replace gland JBX-1039C |
| 15 Aug 2025 | Medium | PX_TIT-556A | [MSI-B-25-FTU-227] Permanent repair |
| 25 Jun 2025 | Low | PX_FIT-278 | Check FIT-278.ok |
| 21 May 2025 | Low | PX_JBX-1039C | JBX-1039C water ingress |
| 08 May 2025 | Medium | PY_PP-1139B-M | Install scaffolding at PP-1139B-M |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 27 Dec 2025 | 2 | 201000019016 | Corrective |
| 16 Nov 2025 | 1 | 201000014817 | Corrective |
| 15 Oct 2025 | 1 | 204000026329 | Preventive |
| 14 Oct 2025 | 1 | 204000026329 | Preventive |
| 19 May 2025 | 1 | 201000022774 | Corrective |