Sparely
DU

GLAND,CABLE,MODEL EB364,INCOLOY

Material 4200001401 · GLAND · Plant 1000

AReduceExcess
Material
4200001401
Category
GLAND
Base unit
EA
MRP type
Non Stock
Criticality
A (7 of 12 FuncLocs A/B)
Supplier
PRIMA LOGAM SENTOSA PT
Lead time
35 d · P80 50 d
Unit price
Rp 329,265

Recommendation

  • 1.Forecast 4.1 EA/year: 4.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~35 days; expected demand during lead time 0.4.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 10.
  • 4.Stock 21 exceeds the level to keep (10) by 11.
  • 5.Installed on 12 FuncLoc(s), 7 of them criticality A/B.
  • 6.ML early warning: 49% probability of demand in the next 90 days.
ML early warningConvert to Stock ItemSingle source
On hand / on order
21 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
10
order qty 5
Service level
100.0%
stockout risk now 0%
Unit price
Rp 329,265
PO history
ML early warning: 49% probability this part is needed in the next 90 days (above the 30% warning threshold). Inputs: 3 issue days in the last 180 days, last issue 116 days ago, 1 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 2 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (7 units) excluded from the baseline.

Demand pattern Intermittent · 4 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 960.5M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~16 days.

Installed on 12 functional locations

7 with criticality A/B · 19 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-166A-M
MOTOR FOR PP-166A
A110.19
PX_KC-371B-M
MOTOR FOR KC-371B
A100.57
PX_PP-952A-M
MOTOR FOR PP-952A
A100.19
PX_PP-1775A-M
MOTOR FOR PP-1775A
B310.62
PX_DPT-125A
KC-308B DP
B100.06
PX_PP-1070B-M
MOTOR FOR PP-1070B
B100.19
PY_PP-1063-M
MOTOR FOR PP-1063
B100.19
PX_PP-103-M
MOTOR FOR PP-103
C121.05
PX_KC-536A-M
MOTOR FOR KC-536A
C111.00
PX_PP-256-CSS
CONTROL SWITCH STATION FOR PP-256-M
C110.19
PX_PIT-210-19A
FEED PRESSURE
S300.04
PX_PP-1471A-M
MOTOR FOR PP-1471A
S400.19

Lead time and procurement

Lead time 35 ± 13 days (PO history, 8 PO lines) · on-time 44%

PR dateTypeQtyUnit priceDeliveryLead time
11 May 2026PR06
Regular replenishment
5Rp 327,32901 Jun 202621 d
10 May 2026PR05
Project / turnaround
5Rp 330,21027 Jun 202648 d
18 Feb 2026PR10
Other
3Rp 322,16310 Apr 202651 d
19 Jan 2026PR03
Regular replenishment
5Rp 328,31922 Feb 202634 d
06 Dec 2025PR06
Regular replenishment
5Rp 342,59831 Dec 202525 d
16 Sept 2025PR06
Regular replenishment
7Rp 332,21311 Nov 202556 d
10 Aug 2025PR06
Regular replenishment
6Rp 346,61011 Sept 202532 d
15 May 2025PR04
Regular (other)
6Rp 318,74819 Jun 202535 d

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
02 Sept 2026LowPX_PP-103-MPP-103-M bearing noise
02 Aug 2025MediumPX_PP-103-MReplace lamp as per PM finding
25 Jul 2025LowPX_PP-1775A-MReplace lamp as per PM finding
02 Jun 2025MediumPX_KC-536A-MKC-536A-M bearing noise
30 May 2025MediumPX_PP-166A-MPP-166A-M high temp
30 May 2025LowPX_PP-256-CSSLeak from packing

Recent goods issues

Posting dateQtyOrderOrder type
07 Jun 20262201000004959Corrective
27 Apr 20262201000012822Corrective
22 Apr 20261201000036349Corrective
07 Sept 20251201000000555Corrective
26 Aug 20251203000020904Turnaround
25 Aug 20252203000020904Turnaround
25 Aug 20251203000020904Turnaround
24 Aug 20251203000020904Turnaround
23 Aug 20251203000020904Turnaround
22 Aug 20251203000020904Turnaround