GLAND,CABLE,SIZE UC872,A105
Material 4200001422 · GLAND · Plant 1000
AReorderNormalBelow reorder point
- Material
- 4200001422
- Category
- GLAND
- Base unit
- EA
- MRP type
- Non Stock
- Criticality
- A (2 of 8 FuncLocs A/B)
- Supplier
- No PO history
- Lead time
- 29 d · P80 52 d
- Unit price
- Rp 183,915 (est.)
Recommendation
- 1.Forecast 4.1 EA/year: 4.1 unplanned (credibility blend: own history + installed-base prior).
- 2.Lead time ~29 days; expected demand during lead time 0.3.
- 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 10.
- 4.On hand 1 + on order 0 is at or below the reorder point: order 9 now.
- 5.Installed on 8 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
9 EA
Rp 1.7M · order by 01 Oct 2026
Expected arrival ≈ 29 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
10
order qty 5
Service level
100.0%
stockout risk now 18%
Unit price
Rp 183,915
Category + unit estimate
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 90 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.
Consumption history and 12-month forecast
Units per month. Turnaround issues (0 units) excluded from the baseline.
Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.
Cost of each service level
Annual holding vs downtime-risk cost for this part
Not stocking at all would cost Rp 883.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~16 days.
Installed on 8 functional locations
2 with criticality A/B · 11 units installed
| FuncLoc | Crit. | Installed | Notifications | Failures / yr |
|---|---|---|---|---|
| PX_PP-1619A-M MOTOR FOR PP-1619A | A | 1 | 0 | 0.19 |
| PX_PP-531B-M MOTOR FOR PP-531B | B | 1 | 1 | 0.62 |
| PX_LIT-975B PP-392A LEVEL | C | 1 | 4 | 1.32 |
| PX_DPT-1262 PP-899A DP | C | 2 | 0 | 0.06 |
| PX_PP-1678A-M MOTOR FOR PP-1678A | C | 1 | 0 | 0.19 |
| PX_PP-683A-M MOTOR FOR PP-683A | C | 1 | 0 | 0.19 |
| PX_FIT-1881A FLOW | S | 3 | 2 | 0.47 |
| PY_TEL-1304B HE-1093A OUTLET | S | 1 | 0 | 0.01 |
Lead time and procurement
Lead time 29 ± 16 days (Category estimate, 0 PO lines) · on-time –
No purchase history: price and lead time are estimated from parts of the same category.
Planned maintenance demand (next 12 months)
No part-consuming maintenance job uses this part in the next 12 months.
Recent notifications on its equipment
| Date | Priority | FuncLoc | Description |
|---|---|---|---|
| 08 Mar 2026 | Medium | PX_FIT-1881A | FIT-1881A reading frozen |
| 24 Oct 2025 | Low | PX_LIT-975B | AR25/tranmsitter low performance |
| 29 Sept 2025 | Low | PX_LIT-975B | Repair insulation LIT-975B |
| 28 Aug 2025 | Low | PX_LIT-975B | LIT-975B abnormal indication |
| 21 Jul 2025 | Medium | PX_PP-531B-M | Replace lamp as per PM finding |
| 15 May 2025 | Low | PX_LIT-975B | AR25/tranmsitter low performance |
| 11 May 2025 | Medium | PX_FIT-1881A | FIT-1881A error |
Recent goods issues
| Posting date | Qty | Order | Order type |
|---|---|---|---|
| 03 Jul 2026 | 1 | 201000000805 | Corrective |
| 03 Jan 2026 | 1 | 201000025903 | Corrective |
| 12 Dec 2025 | 1 | 201000014450 | Corrective |
| 11 Dec 2025 | 2 | 201000014450 | Corrective |
| 25 May 2025 | 3 | 201000028666 | Corrective |