Sparely
DU

GLAND,CABLE,SIZE UC872,A105

Material 4200001422 · GLAND · Plant 1000

AReorderNormalBelow reorder point
Material
4200001422
Category
GLAND
Base unit
EA
MRP type
Non Stock
Criticality
A (2 of 8 FuncLocs A/B)
Supplier
No PO history
Lead time
29 d · P80 52 d
Unit price
Rp 183,915 (est.)

Recommendation

  • 1.Forecast 4.1 EA/year: 4.1 unplanned (credibility blend: own history + installed-base prior).
  • 2.Lead time ~29 days; expected demand during lead time 0.3.
  • 3.A 100.0% service level gives the lowest holding + downtime-risk cost: reorder at 5, order up to 10.
  • 4.On hand 1 + on order 0 is at or below the reorder point: order 9 now.
  • 5.Installed on 8 FuncLoc(s), 2 of them criticality A/B.
Proposed purchase requisition
9 EA
Rp 1.7M · order by 01 Oct 2026
Expected arrival ≈ 29 days
Convert to Stock ItemPrice estimatedLead time estimated
On hand / on order
1 / 0
no open PO
Today Min / Max
0 / 0
static parameters in BoM
Rec. Min (reorder point)
5
safety stock 5
Rec. Max
10
order qty 5
Service level
100.0%
stockout risk now 18%
Unit price
Rp 183,915
Category + unit estimate
ML early warning: 19% probability this part is needed in the next 90 days (below the 30% warning threshold). Inputs: 1 issue days in the last 180 days, last issue 90 days ago, 0 failure notifications on its equipment in 90 days, 0 planned jobs in 90 days, 0 PRs in 180 days.

Consumption history and 12-month forecast

Units per month. Turnaround issues (0 units) excluded from the baseline.

Demand pattern Intermittent · 5 issue days · method: Credibility blend: own history + installed-base prior.

Cost of each service level

Annual holding vs downtime-risk cost for this part

Not stocking at all would cost Rp 883.8M/yr in expected downtime and emergency buys. A stockout here stops production with probability 1.07% for ~16 days.

Installed on 8 functional locations

2 with criticality A/B · 11 units installed

FuncLocCrit.InstalledNotificationsFailures / yr
PX_PP-1619A-M
MOTOR FOR PP-1619A
A100.19
PX_PP-531B-M
MOTOR FOR PP-531B
B110.62
PX_LIT-975B
PP-392A LEVEL
C141.32
PX_DPT-1262
PP-899A DP
C200.06
PX_PP-1678A-M
MOTOR FOR PP-1678A
C100.19
PX_PP-683A-M
MOTOR FOR PP-683A
C100.19
PX_FIT-1881A
FLOW
S320.47
PY_TEL-1304B
HE-1093A OUTLET
S100.01

Lead time and procurement

Lead time 29 ± 16 days (Category estimate, 0 PO lines) · on-time –

No purchase history: price and lead time are estimated from parts of the same category.

Planned maintenance demand (next 12 months)

No part-consuming maintenance job uses this part in the next 12 months.

Recent notifications on its equipment

DatePriorityFuncLocDescription
08 Mar 2026MediumPX_FIT-1881AFIT-1881A reading frozen
24 Oct 2025LowPX_LIT-975BAR25/tranmsitter low performance
29 Sept 2025LowPX_LIT-975BRepair insulation LIT-975B
28 Aug 2025LowPX_LIT-975BLIT-975B abnormal indication
21 Jul 2025MediumPX_PP-531B-MReplace lamp as per PM finding
15 May 2025LowPX_LIT-975BAR25/tranmsitter low performance
11 May 2025MediumPX_FIT-1881AFIT-1881A error

Recent goods issues

Posting dateQtyOrderOrder type
03 Jul 20261201000000805Corrective
03 Jan 20261201000025903Corrective
12 Dec 20251201000014450Corrective
11 Dec 20252201000014450Corrective
25 May 20253201000028666Corrective